![Excell PWH3 Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/excell/pwh3/pwh3_user-manual_2449518004.webp)
EXCELL PRECISION CO., LTD
02005159 ZSME300000225
3
Special Notice
While installing the load cell, power cord hookup or replacing a new rechargeable
battery, the indicator housing must be opened. It must be done by a technician assigned
by your electronic indicator provider to avoid affecting the waterproof ability of this indicator.
Before opening the housing, make sure the indicator is dry, if there is any liquid on it,
please wipe it with a clean cloth.
HOW TO INSTALL THE HOUSING
After installing the load cell, power cord hookup or replacing a new rechargeable battery,
the housing must be screwed by the assigned order as shown below. Screw lightly first,
then screw them tight using a 12 kgf-cm torsion.
P.s. Please use a torsion-adjustable screw driver.
Screwing order:
1
2
3
4
5
6