4.9.5 Install the tray after the splicing
4.9.6 Cable sealing
Insert the fixtures to the relative cable port one after another and then fasten the bolts with a spanner.
5.10.1 After the installation of cables, secure the cover and then tighten the bolts by using the spanner properly (less than 50N).
5.10.2 Fibre test and sealing test
4.11.1 Wall-mounting
4.11.1.1 Fix the hoop on the closure with M6x12 hexagonal bolts and M4x15 bolts.
4.11.1.2 Choose the place to install and then install M10 bolts in 65mm.
4.11.1.3 Fix the closure on the wall
4.11.2 Aerial-mounting installation
4.11.2.1 Fix the hoop on the closure with M6×12 hexagonal bolts and M4×15 bolts.
4.11.2.2 Fix the aerial hook through the connecting bar
4.11.2.3 Fix the bar through the hook on the strand
You can insert the air to test after the sealing of the closure and do the protection of cable. (Your choice to have a valve or no
valve)
4.10 Assemble the closure
4.11 Installation of FOSC