
WT.050.590.002.UA.IM.0614
10
SFC ANALYZER / CONTROLLER
EVOQUA
W3T109634
2.2.2
Installation with Mounting Rail (see drawing 50.590.100.070)
1. Fasten the mounting rail to the wall with two screws.
2. Hook the electronic module onto the mounting rail so that it is flush to the
right and fasten to the wall with two screws.
2.2.3
Installation without Mounting Rails (see drawing 50.590.100.080):
If the electronics module is not going to be mounted on the mounting rail the
modules can be hooked onto suitable tallow-drop screws by the top holding
fixtures instead. Proceed with the installation as described above.
2.3
Commissioning
2.3.1
Installation Guide
Commissioning procedure:
Once the unit has been installed the electrical connections can be made.
The following table contains the individual commissioning steps in their cor-
rect sequence.
Completion of each task can be confirmed in the "Completed" column.
NOTE: If this installation sequence cannot be complied with, please contact
you Evoqua Water Technologies service department.
Содержание Wallace & Tiernan SFC-SC
Страница 1: ...SFC SC MEASURING AND CONTROL SYSTEM BOOK NO WT 050 590 002 UA IM 0614 W3T109634 U S W3T200493 Germany...
Страница 2: ...SFC SC MEASURING AND CONTROL SYSTEM BOOK NO WT 050 590 002 UA IM 0614 W3T109634 U S W3T200493 Germany...
Страница 11: ...WT 050 590 002 UA IM 0614 SFC ANALYZER CONTROLLER EVOQUA W3T109634...
Страница 12: ......
Страница 19: ......
Страница 47: ...WT 050 590 002 UA IM 0614 34 SFC ANALYZER CONTROLLER EVOQUA W3T109634...
Страница 48: ......
Страница 60: ...WT 050 590 002 UA IM 0614 46 SFC ANALYZER CONTROLLER EVOQUA W3T109634...
Страница 61: ......
Страница 77: ...WT 050 590 002 UA IM 0614 62 SFC ANALYZER CONTROLLER EVOQUA W3T109634...
Страница 78: ......
Страница 81: ......