POWER BEAM INSTALLATION GUIDELINES
Base Feed and Base Feed Cover
STEP 1: Hang the base feed on the slots above the “U” bracket and secure it with the provided zip tie.
STEP 2: Run the flexible portion of the feed through the opening in the bottom of the Power Beam.
STEP 3: Add the base feed cover and secure it using the two provided screws.
STEP 4: Snap on two spring clips to accept the end trim with end cap.
STEP 5: Adjust levelers as needed.
Note: There must be only one power feed entry into each cluster of stations.
Connection to the building supply must be done only by a licensed electrician,
and in accordance with applicable codes and regulations.
Do not connect or disconnect components while the system is under load!
Disconnect the main power before servicing or reconfiguration
Slots for Base
Feed bracket
2
3
1
4
4
5
Base Feed and Base Feed Cover
STEP 1: Install the long fl at trims (a) by snapping them on the exposed sides of the post.
STEP 2: Snap on the shorter fl at trims (b) on the post, below the power beam.
STEP 3: Press in the PVC slot covers (c) between the connectors. Tear off the fl exible side of
the PVC slot cover when inserting it between the long trim and the connector.
STEP 4: Install the post top cap (d).
STEP 5: Adjust the leveler as needed.
1
3
2
4
5
a
c
b
b
b
d
Tear off
fl exible side
Tear off
fl exible side
Do not tear off
fl exible side
Do not tear off
fl exible side