EVO42
15
www.evolutionsteel.com
• Operate the
Red
switch
(Fig. 4)
situated at the rear of the
machine to energise the magnet.
• Check that the machine is firmly attached to the Mild Steel plate.
• Operate the
Black
motor switch located on
the top of the machine.
(Fig. 5)
• Allow the motor to run for a few seconds to check for any
unusual noise or vibration.
• Do not use the machine if any vibration or unusual noises are
detected or if magnetic adhesion is questionable. Have the
machine serviced by a qualified person, or if under guarantee
refer to the guarantee agreement.
• Turn ‘OFF’ the machine when all testing has been completed.
INSTALLING A CUTTER
Select a cutter suitable for the operation to be performed. Check
the cutter to ensure that it is sharp and is not damaged in any way.
• Insert the pilot pin into the cutter ensuring that
it slides smoothly.
(Fig.6)
• Raise the cutting head to its highest position.
• Check that the cutter securing grub screws located in the
spindle are not protruding into the spindle bore.
(Fig.7)
• Align the two flats on the cutter shaft with
the grub screws in the spindle.
• Start to tighten one of the grub screws and at the same time slightly
rotate the cutter backwards and forwards until the grub screw is fully
tightened. This will ensure that the grub screw is located squarely
onto the flat preventing the cutter from becoming loose.
• Tighten the remaining grub screw.
Fig. 4
Fig. 5
Fig. 6
Fig. 6
Содержание EVO42
Страница 20: ...20 www evolutionsteel com SERVICED PARTS LIST ...
Страница 21: ...EVO42 21 www evolutionsteel com SERVICED PARTS LIST ...
Страница 23: ...EVO42 23 www evolutionsteel com Notes ...
Страница 24: ......