Transit
When the heat pump is to be transported, please keep the unit
standing upright. The unit cannot be laid down, otherwise inner
parts of the device may become damaged.
If the unit needs to be hung up during installation (for the Evo Max 100 unit, four
sling wires longer than 8m are to be used. Use the special lifting hole (hook) on the
unit base), an 8 metre cable will be needed to do so. There must be padding of
some kind between the cable and the unit to prevent damage to the heat pump
cabinet.
DO NOT TOUCH THE RADIATING FINS BEHIND THE MACHINE WITH HANDS OR
OBJECTS!
3.3
Installation Notes
-
The unit can be installed in any outdoor area which can carry heavy machinery, such as a terrace,
rooftop, the ground etc.
-
The location must have adequate ventilation and be free from strong winds.
-
The installation location must be free from heat radiation and fire hazards.
-
Ensure there are no obstacles near the air inlet and outlet of the heat pump.
-
There must be a water channel around the heat pump to drain condensing water.
-
Ensure that there is enough space around the unit for maintenance.
-
The heat pump can be installed onto the concrete basement using expansion screws, or onto a steel
frame with rubber feet which can be placed on the ground or rooftop. Ensure the unit is placed
horizontally.
3.4
Location of the Unit
Содержание EVO MAX 32
Страница 1: ...P a g e 1...
Страница 5: ...P a g e 5 2 2 Unit Dimensions Evo Max 32...
Страница 7: ...P a g e 7...
Страница 8: ...P a g e 8...
Страница 12: ...P a g e 12 4 Controlling and Operation 4 1 Controller Display...
Страница 13: ...P a g e 13 4 2 How to Use the Controller 4 2 1 Power On 4 2 2 Check Parameters...
Страница 14: ...P a g e 14 4 2 3 Temperature Settings...