5
evo HE H
-
Installation & Servicing
GENERAL
CONTENTS
Air Supply
.......................................................................
9
Benchmark Commissioning Checklist
.....................
54
Boiler Clearances
.........................................................
6
Boiler Exploded Diagram
............................................
14
Electrical Connections
...............................................
27
Electrical Supply
...........................................................
9
Electrical Systems Diagrams
....................................
30
Extension Ducts - Fitting
.............................................
19
Fault Finding
.................................................................
45
Flow Wiring Diagram
..................................................
29
Flue Fitting
..............................................................
16-19
Flue Installation Requirements
....................................
8
Gas Safety Regulations
................................................
7
Gas Supply
.....................................................................
8
Initial Lighting
..............................................................
31
Installation
.............................................................
14-32
Mandatory Requirements
.............................................
7
Safe Handling
................................................................
8
Servicing
................................................................
33-44
Short List of Parts
.......................................................
49
Terminal Guards
............................................................
8
Thermostatic Radiator valves
....................................
9
Water and Systems
......................................................
9
Water Connections
..................................................
6,27
Water Treatment
.........................................................
13
Wiring Diagrams
.........................................................
29
evo HE
B
oiler
Page
Make and model ....................................................... 5
Appliance serial no. on data badge ...................... 14
SEDBUK No. % ......................................................... 4
Controls
Time and temperature control to heating ............. 30
Time and temperature control to hot water .......... 30
Heating zone valves .............................................. n/a
TRV's ......................................................................... 9
Auto bypass .............................................................. 9
Boiler interlock .......................................................... 9
For all boilers
Flushing to BS.7593 .............................................. 13
Inhibitor .................................................................. 13
Central heating mode
Heat input ................................................to be calculated
For assistance see Technical Helpline on the back page
Page
Burner operating pressure .................................... n/a
Central heating flow temp. ...... measure and record
Central heating return temp. ... measure and record
For combination boilers only
Scale reducer ......................................................... n/a
Hot water mode
Heat input ............................................................... n/a
Max. operating burner pressure .............................. n/a
Max. operating water pressure ............................. n/a
Cold water inlet temp ............................................ n/a
Hot water outlet temp. ........................................... n/a
Water flow rate at max. setting .............................. n/a
For condensing boilers only
Condensate drain ............................................ 20, 21
For all boilers:
complete, sign & hand over to customer
For GB, to comply with Building Regulations Part L1 (Part 6 in Scotland) the boiler should be fitted in accordance with the
manufacturer's instructions. Self-certification that the boiler has been installed to comply with Building Regulations can be
demonstrated by completing and signing the Benchmark Commissioning Checklist.
Natural Gas only
BENCHMARK COMMISSIONING CHECKLIST DETAILS
NOTE TO THE INSTALLER: COMPLETE
THE BENCHMARK COMMISSIONING
CHECKLIST AND LEAVE THESE
INSTRUCTIONS WITH APPLIANCE
Boiler size
G.C. Appliance No.
PI No.
(Benchmark No.)
H12
41 397 96
87 BP 34
H16
41 397 86
87 BP 34
H19
41 397 93
87 BP 34
H22
41 397 94
87 BP 34
Destination Countries:
GB, IE
203323-2.pmd
21/09/2007, 11:26
5
Содержание H12
Страница 2: ...2 evo HE H Installation Servicing ...
Страница 52: ...52 evo HE H Installation Servicing NOTES ...