
16
2551868AB
HOW TO INSTALL PRE-INSTALLATION RIG
STEP1: Securely fix the mounting
bracket to the wall in the required
position. Hang the ModuSat® XR Pre-
Installation Rig on the wall fixing
bracket. Then slide down and across to
the right, as indicated in diagram.
STEP2: Fit the Evinox Energy Flushing
Bypass & Valve Kit to the rig and then
make final connections to the pipework
running to the ModuSat®.
STEP3: Shut off isolation valves,
pressure test pipework and then
disconnect the valve unions.
STEP4: To remove the pre-installation
rig slide the rig to the left taking all
connections off centre, slowly lift and
remove.
Pre-installation Rig Typical Dimensions for ModuSat XR ECO TP-30/55/70-…