107678
|
V1.5-10/2019
35/ 106
Commissioning 4
Chapter Overview
This chapter outlines the initial setup of the machine.
4.1
Initial commissioning
It is imperative to read the
“1.4 General safety instructions” on page 11
manual before commissioning the machine.
Specifications for the electrical connection and the standards quoted apply for connecting
the coffee machine in EU countries. It may be necessary to also observe additional country-
specific regulations. Outside the EU, acceptance of the standards quoted is to be checked by
the legal entity or person who wishes to use the coffee machine.
The machine weighs > 50 kg, two people are required to unpack, transport and/or lift it onto
a flat stable table capable of bearing its weight.
If using a forklift, hand stackers or any other manual lifting equipment, make sure to use it
according to local regulations.
Your service organization will put your coffee machine in operation for the first time and instruct you
on its operation.
Subsequent recommissioning, decommissioning or any service and repair operations will also be
undertaken by your service organization.
Содержание e Series
Страница 1: ...User Manual DOC 107678 1 5 10 2019 ...
Страница 28: ...2 Description 28 106 e line User Manual Eversys AG PAGE INTENTIONALLY LEFT BLANK ...
Страница 34: ...3 Software 34 106 e line User Manual Eversys AG PAGE INTENTIONALLY LEFT BLANK ...
Страница 105: ...107678 V1 5 10 2019 105 106 Notes ...