24
Assembly Instructions
a. Thread the Lower Cable (
28
) through the Leg Developer (
11
), and fix 1 x Ø78 Pulley (
70
) using 1 x
M10 x 60mm Allen Bolt (
49
), 2 x Pulley Bushings (
32
) and 1 x M10 Aircraft Nut (
57
).
b. Thread the Lower Cable (
28
) through the Front Press Support Frame (
17
), and fix 1 x Ø78 Pulley (
70
)
using 1 x M10 x 60mm Allen Bolt (
49
), 2 x Pulley Bushings (
32
) and 1 x M10 Aircraft Nut (
57
).
c. Thread the Lower Cable (
28
) through the Front Press Base (
9
), and fix 1 x Ø78 Pulley (
70
) using 1 x
M10 x 180mm Allen Bolt (
52
), 2 x Pulley Bushes (
32
) and 1 x M10 Aircraft Nut (
57
)..
d. Thread the Lower Cable (
28
) through the Vertical Frame (
3
), and fix 1 x Ø78 Pulley (
70
) to the Vertical
Frame (
3
) using 1 x M10 x 85mm Allen Bolt (
50
), 2 x Pulley Bushes (
31
) and 1 x M10 Aircraft Nut (
57
).
e. Thread the Lower Cable (
28
) through the Vertical Frame (
3
), and fix 1 x Ø78 Pulley (
70
) using 1 x M10
x 85mm Allen Bolt (
50
), 2 x Pulley Bushes (
31
) and 1 x M10 Aircraft Nut (
57
).
f. Thread the Lower Cable (
28
) through the Angled Double Pulley Bracket (
19
), and fix 1 x Ø78 Pulley
(
70
) using 1 x M10 x 25mm Allen Bolt (
44
), 2 x Pulley Covers (
60
), 2 x Ø10mm Washers (
56
) and 1 x
M10 Aircraft Nut (
57
).
g. Thread the Lower Cable (
28
) through the bracket on the Main Base Frame (
1
), and fix 1 x Ø78 Pulley
(
70
) using 1 x M10 x 40mm Allen Bolt (
45
), 2 x Ø10mm Washers (
56
) and 1 x M10 Aircraft Nut (
57
).
h. Thread the cable through the Double Floating Pulley Brackets (
20
), and cover 1 x Ø78 Pulley (
70
) with
2 x Pulley Covers (
60
), secure with 1 x M10 x40mm Allen Bolt (
44
), 2 x Ø10mm Washers (
56
) and 1 x
M10 Aircraft Nut (
57
).
i. Fix the other end of the Lower Cable (
28
) to the Main Base Frame (
1
) using 1 x M10 x 25mm Allen Bolt
(
44
), 2 x Ø10mm Washers (
56
) and 1 x M10 Aircraft Nut (
57
).
Step 18