
10
Warning:
Risk of electric shock.
Before installing the wall dock, make sure that the power line you’re using is
switched off on your service panel.
Make sure that the power line to Elvi is installed on a dedicated circuit breaker
(MCB) on your service panel. The installation must incorporate an adequate residual-
current device (RCD). The MCB must be in line with the capacity of the charging
cable (3.7, 7.4, 11, 22 kW). In case the amperage rating of the charging cable is
different than the amperage rating of the (MCB), the installer/user must change the
station settings in the mobile app and/or web platform for station management as
provided by the operator or service provider for this product.
Be aware that local regulations may be applicable and may vary depending on your
region/country of residence. The installing party must always ensure that the station
is installed according to the local regulations.
The installation settings of your service panel must always be adjusted by a qualified
electrician.
8 mm
drill bit
drill
knife
4x screw
5 x 70 mm
4x plug
8 x 65 mm
1x bit T25
1x bit T30
flat-head
screwdriver
2. Install
wall dock
Tools you need to install the wall dock
Included
in the box
Not included
in the box
rubber seal strain relief
bubble
level
bit-holding
screwdriver
1x bit T20
sleeve with
drilling template
EN
Содержание Elvi
Страница 1: ...1 Installation manual Elvi ...
Страница 2: ...2 I m home Let s get started ...
Страница 3: ...3 Installation manual Elvi ...
Страница 9: ...9 1 Unpack Elvi Wall dock already installed Go to next page Go to page 13 YES NO EN ...
Страница 29: ...31 I m all set Let s charge ...
Страница 30: ...32 EVBIM_072019 EVBox Manufacturing B V ...