EVAPCO ATC-DC Series Скачать руководство пользователя страница 5

Joining Multi-Cell Units

Basin Sections - 17’ and 24’ Wide Models (12’ to 40’ Long)

4.  Clean the mating flanges on the equalizer flume on the

end to be field connected. Apply a layer of sealer tape on
the flange, centered between the hole centers and the
outside edge. Remove paper backing strip from the sealer
tape.

5.  Clean the mating surface of the side panel of any dirt,

grease or moisture. Rig the second basin section adjacent
to the equalizer flume on the steel support.

6.  Align the bolt holes in the equalizer flume and equalizer

opening with drift pins while drawing the second basin
section against the first as shown in Figure 8.

7.  Install 3/8” bolts, nuts and washers in every hole around

the equalizer opening and tighten. Cut off excess sealer
tape to prevent strainer blockage

8.

Bolt the second basin section to the steel support.

9.  Place the drip channel over the adjoining pan section

flanges.  Secure by installing 5/16” self-tapping screws
through the retaining clips into the side panel.  For
stainless steel construction, secure by installing ¼”
stainless steel bolts through the retaining clips into brass
rivnuts secured in the side panel.  (See figures 8 & 9.)

10. Fasten the drip channel sections together, end to end, by

driving a self-tapping 5/16” screw through the section end
with the larger hole into the mating end with the smaller
hole. Stainless steel units will use 5/16” stainless steel
nuts, bolts, and washers. (See Figure 9.)

11.  Place the vertical splash guard in the bend of the vertical

supports. Attach the vertical splash guard using 5/16”
tappers. For stainless steel constuction, attach the vertical
splash guard using 5/16” stainless steel nuts and bolts.
(See Figure 10.)

5

ATC-DC Condenser & eco-ATWB-H Closed Circuit Cooler

Figure 9 

- Drip Channel Assembly

Figure 10 

- Drip Channel and Splash Guards, 

17’ & 24’ Wide Models

Applying Sealer Tape

Once the bottom section has been set on the supporting steel
and bolted in place, the top flanges should be wiped down to
remove any dirt or moisture. Sealer tape should be placed over
the mounting hole centerline on the side flanges. Apply two
strips of sealer tape, one partially overlapping the other, on the
end flanges.

The sealer tape should overlap on the corners as shown in
Figure 11. Do not splice the sealer tape along the end flanges
and preferably not on the side flanges if it can be avoided.

Always remove the paper backing from the sealer tape. 

Units that are 24’ to 40’ in length have two or more coil/fan
sections. In these cases, sealer must be applied to all internal
flanges. Cut off excess sealer tape once the top section has
been properly set into place and the rig is complete.

Figure 11 

- Proper Sealer Tape Application

SEALER TAPE

DRIP CHANNEL SECTION

2 OVERLAPPING

LAYERS OF SEALER

ON THE ENDS

1 LAYER OF SEALER

CENTERED OVER

MOUNTING HOLE

END

SIDE

Содержание ATC-DC Series

Страница 1: ...Inc A wholly owned subsidiary of EVAPCO Inc 8331 Nieman Road Lenexa KS 66214 USA Phone 913 322 5165 Fax 913 322 5166 E mail marketing evaptech com Tower Components Inc A wholly owned subsidiary of EV...

Страница 2: ...The International Building Code IBC is a comprehensive set of regulations addressing the structural design and installation requirements for building systems including HVAC and industrial refrigeratio...

Страница 3: ...nels and splash guards to keep water from exiting between the cells The equalizer flume is factory installed on one section for field connection to the other It is important to connect the equalizer f...

Страница 4: ...er Joining Multi Cell Units Basin Sections 17 20 24 Wide Models 12 to 40 Long On 17 20 and 24 wide models the equalizer flume is located on the sides of adjoining basin sections This flume is shipped...

Страница 5: ...the mating end with the smaller hole Stainless steel units will use 5 16 stainless steel nuts bolts and washers See Figure 9 11 Place the vertical splash guard in the bend of the vertical supports Att...

Страница 6: ...BOLTS SPREADER BEAM H Figure 14 Four Point Lift Fan Section Four lifting ears are provided in the lower corners of most coil fan sections for lifting into final position Some fan sections will have a...

Страница 7: ...f the unit Refer to Tables 1 and 2 for minimum H dimensions The preferred method for extended lifts is to use slings under the unit See Figure 16 Spreader bars should always be used between the cables...

Страница 8: ...sist with alignment Figure 17 Mating Upper Section to Basin Section Section 17 20 and 24 Wide Models Before assembling the coil section to the basin section remove any loose parts shipped in the pan W...

Страница 9: ...to Coil Basin Section 17 20 and 24 Wide Models Before assembling the fan section to the basin section wipe the flanges on the bottom of the coil fan section Check to see that the motor access doors ar...

Страница 10: ...SCREEN RODS FAN SCREEN ROD 1 2 BOLTS FLATWASHER LOCKWASHER FAN CYLINDER HEX NUTS WIRE CLIP Mounting Fan Screens 10 12 Wide by 14 through 20 Long Models 10 12 Wide by 28 through 40 Long Models 20 24 Wi...

Страница 11: ...move the ladder bracket mounting bolts 1 from the ladder mounting channels 2 on pan and casing sections 2 Loosen but do not remove the ladder bracket and assembly bolts 3 3 Slide the ladder bracket as...

Страница 12: ...rization SCALE 1 ALL 1 4 HOLES SHOULD BE 11 32 2 USE STAINLESS STEEL N C SET UP SHEET F F DETAIL E DETAIL B DETAIL A DETAIL C SHIP THIS DRAWING WITH UNIT CONNECTION PLATE CONNECTION PLATE SECURE DECK...

Страница 13: ...the side flanges although none are required on the end flanges NOTE Do not use U bolts to lift the discharge hood damper section when attached to another part of the equipment Always lift the hood Fi...

Страница 14: ...sing of unit for belt installation 7 Install Powerband belt K Figure 32 around fan sheave and motor sheave Tighten belt by adjusting nuts on J bolts Do not over tighten the belts The center of the bel...

Страница 15: ...nders of all models Check and tighten all bolts Float Valve Adjustment The float valve is pre set at the factory however adjustment should be checked after rigging The float valve should be adjusted s...

Страница 16: ...218B to 305B 77 3I to 77 6K 8 5x9 0 14 4 2 246B to 369B 89 3I to 89 6L 8 5x10 5 0 16 4 2 358B to 409B 102 3J to 102 6L 8 5x12 0 18 5 2 385B to 473B 119 3J to 119 6M 8 5x14 0 22 5 2 486B to 630B 153 3I...

Страница 17: ...Electronic Water Level Control PVC Standpipe Strapped Inside Unit Basin Shipping Location is Unit and Accessory Dependent External Service Platform with Ladder If Space is Available Strapped Inside U...

Страница 18: ...18 ATC DC Condenser eco ATWB H Closed Circuit Cooler Notes...

Страница 19: ...19 ATC DC Condenser eco ATWB H Closed Circuit Cooler Notes...

Страница 20: ...EVAPCO Inc P O Box 1300 Westminster MD 21158 USA PHONE 410 756 2600 FAX 410 756 6450 E MAIL marketing evapco com 2014 EVAPCO Inc Printed on recycled paper using soy based ink...