![EV-OPTIMIZER High Current Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/ev-optimizer/high-current/high-current_installation-manual_2441373005.webp)
5
Installation manual
|
High Current
Step 7
Put the data cable through the corresponding opening
and attach the 2 wires from 1 wire pair of the SF-UTP
cable in the orange/black connector as shown on image
2 and plug the connector to the corresponding RS485-
port in the High Current. See image 1 (A) on page 4.
Make sure that the 2 wires correspond with the
connected wires of the modem in the supply station.
Step 8
Connect the power in the High Current to the
corresponding connection. See image 1 (B)
on page 4. Connect the power.
Step 9
Now the LED-light on the print of the High Current
should start to flash.
Image 2