Document ID: 39080000
Rev: C
Technical Support: 1-800-626-6912
Page 12 of 26
STEP 3
Flip the entire extension section over and position if behind the basin. Be sure the pump/handle of
the hydraulic lift lines up with the recess molded into the extension.
STEP 4
Take the power strip and peel off the outer layer of the double sided tape exposing the adhesive.
Place the power strip horizontally on the front of the base underneath the front opening of the
extension. Feed the power strip cord through the appropriate hole at the back of the extension.
STEP 5
Uncoil the hoses and cords coming from the basin and plug in the cords into the power strip.
STEP 6
Run the stainless steel (Hot and Cold) hoses underneath the extension towards the back of the
extension. Remove the brass nut, rubber o-ring and nylon ring from brass bulkhead fitting
.
Pass the
brass bulkhead fitting through the holes in the back of the extension. Put the fitting with the red o-ring
through the small right hole. Put the fitting with the blue o-ring in the small center hole. Place the
rubber o-ring, then the nylon o-ring onto the fitting and tighten brass nut using the Crescent or
Channel Locks Wrench and grasping the brass fitting through the access panel.