Euro Towers EURO 500 Скачать руководство пользователя страница 2

 

GENERAL SAFETY RULES

 

 

Mobile access working towers may only be assembled and 

dismantled by persons familiar with these instructions. 

Do not use any scaffold tower which is damaged, which has 

not been properly assembled, which is not firm and stable, 

or which has any missing or damaged parts. 

Do not assemble a scaffold tower on unstable ground or 

objects such as loose bricks, boxes or blocks. Only a sound 

rigid footing must be used. Ensure that the scaffold tower is 

always level and the adjustable legs are engaged. Check 

that you have taken all necessary precautions to prevent 

the tower being moved, or rolling away.  Always apply all 

castor brakes or use base plates. Do not assemble or use a 

scaffold tower near un-insulated, live or energised electrical 

machinery or circuits, or near machinery in operation. 

Outdoor scaffold towers should, wherever possible, be 

secured to a building or other structure. It is good practice 

to tie in all scaffold towers of any height, especially when 

they are left unattended, or in exposed or windy conditions. 

A scaffold tower must not be used in winds stronger than, 

17 mph, Beaufort scale 4. Be cautious if assembling or using 

the tower in open places, such as hangers or unclad 

buildings. In such circumstances the wind forces can be 

increased, as a result of the funnelling effect. Do not use 

sheeted towers; never fit Tarpaulin, nets or other materials 

that may act like a sail. Do not misuse or abuse the scaffold 

tower with heavy objects, hammers etc. Do not throw 

components in and out of vehicles or to the ground when 

the tower is being dismantled. Such abuse may reduce the 

structural integrity of the equipment and scaffold tower. 

Ensure that the scaffold tower is within the maximum 

platform height as stated, and that the appropriate 

stabilizers are fitted. 

Do not lean ladders against the tower, use the access 

ladders fitted to the frames. Never climb the outside of a 

tower. Never climb on horizontal or diagonal braces. Do not 

gain access or descend from the working platform other 

than by the trapdoor access system. Do not work from 

ladders, they are a means of access and egress only. 

Ensure that the equipment is kept clean, Check 
frames and braces, adjustable legs and boards 
for paint, grit, burrs etc. Remove any foreign 
substance with a light wire brush; the inside 
diameter of hooks should be kept clean, all 
hooks should fit onto rungs and uprights 
without the need of force, light oil can be used 
on brace hooks to free the klickers. All frames 
should have interlock clips to lock them 
together. All platforms should be free of trip 
and slip hazards and trapdoors should open 
and close smoothly. 
 
If in any doubt about the proper use and 
maintenance of the scaffold tower equipment, 
consult the manufacturer. 

 

If you must move a tower, remove all materials and 

personnel. When moving a scaffold tower, manual force 

must always be applied pushing from the base. Normal 

walking speed should not be exceeded during relocation. 

The ground over which a tower is moved should be 

capable of supporting the weight of the structure. 

Should you require additional platform heights, add 

further tower equipment. NEVER extend your adjustable 

legs to achieve extra height, these are for levelling only. 

NEVER use a ladder or other objects on the platform to 

achieve additional height. 

It is not permissible to attach and use hoisting facilities 

on towers, unless specifically provided for by the 

manufacturer. 

It is not permissible to attach bridging sections between a 

scaffold tower and a building. Refer to the tower 

manufacturer. 

Guardrails and toeboards must be fitted to the working 

platforms or where materials are stored. Do not exceed 

the safe working load of the platform or structure by 

accumulating debris, material or tools on platforms as 

these can be a significant additional load.  

Never jump on to or off platforms. 

If an overhead hazard exists, head protection should be 

worn. 

MAINTENANCE RULES 

 

Содержание EURO 500

Страница 1: ...RM 250KG Available in 2 Lengths 1 8m 2 5m Double Width 1 45m The tower comprises the minimum possible multi purpose components no separate ladders or guardrail frames are necessary All frames can be used as uppers or lowers simply brace your platform on the third rung below the top of the tower and the correct guardrail height is achieved ...

Страница 2: ...d to the frames Never climb the outside of a tower Never climb on horizontal or diagonal braces Do not gain access or descend from the working platform other than by the trapdoor access system Do not work from ladders they are a means of access and egress only Ensure that the equipment is kept clean Check frames and braces adjustable legs and boards for paint grit burrs etc Remove any foreign subs...

Страница 3: ...T e mp o r a r y P l a t f o r m t e mpp o s i t i o n mo v et or u n g T O WE RWE I G H T K G S ...

Страница 4: ...base ladder frames run continuously up the left hand side Note see kitting page for frame 5 Add 4 diagonal braces from the 1st to 3rd and 3rd to 5th rungs as shown level the tower using a spirit level as a guide 6 Fit the 4 stabilizers supplied with your tower Note Always fit 4 stabilizers unless building in a corner inner stabilizers fit parallel to a wall See kit list for correct size required t...

Страница 5: ...r inside the tower and sitting through the trapdoor fit 4 horizontal braces face down onto the 1st and 2nd rung above the platforms to form your guardrails as shown 13 Fit the toeboard clips to the rung next to the corners of the platforms and then fit the toeboards as shown Note Any gap between the platform board and toeboard must not exceed 25mm 5 rung bases set up the following towers 1 7m 3 7m...

Страница 6: ...uidance or information on this or other products please contact Euro Towers Limited Unit 5 Edgemead Close Round Spinney Northampton NN3 8RG Tel 01604 644 774 Fax 01604 499 544 sales eurotowers co uk www eurotowers co uk ...

Отзывы: