
Images are for illustrative purposes.
We reserve the right to make changes.
RDM-035-0922
9
®
NORD
canopy
|
aSAP
2.2 Hanging the kitchen canopy and ozone duct installation
2.3 Leveling the canopy
Is performed for each module.
2.4 Opening the front panel
B
A
Note! The panel locks automatically.
At the end of the installation, make sure that the panels are correctly fixed.