background image

www.etsnord.com

8

RDM-035-0922

®

NORD

canopy

  

 

|

   

aSAP

2.1  Removing the ceiling panel

Optional!

With larger canopies, removing the center ceiling panel can provide better access for exhaust duct and
insulation installation.

 B 

 B-96 

 L-30 

 L+50 

 L2-30 

 240 

 180 

 L2+25 

 L1+25 

 L+50 

 40 

 48

 

 15 

 48

 

Safety!

It is prohibited to hold or add additional

weight on the top of the canopy..

Содержание NORDcanopy aSAP

Страница 1: ...NORDcanopy aSAP a Self Assembly Package Installation use and maintenance manual www nordcooking ee ...

Страница 2: ...C1 A1 D1 B1 E1 C1 A1 Grease chamber B1 Side panels C1 Supply chamber E1 Ceiling panel D1 Lighting a Packaging foam H Screws M4 16 mm G Bolts M5 10 F1 Supporting beam H G M4 16 M5 10 F1 Content 1 Assembling the canopy 3 2 Canopy installation 7 3 Measuring and adjusting airflow 13 4 Accessories 14 5 Maintenance 15 ...

Страница 3: ...s RDM 035 0922 3 NORDcanopy aSAP 1 Assembling the canopy 1 1 Preparations Note For assembly a clean surface and packaging foam piece a is needed 1 2 Connecting the side panels with grease chamber 1 3 Removing the front panel of supply chamber a A1 B1 Gx12 H G M4 16 M5 10 F1 ...

Страница 4: ...tsnord com 4 RDM 035 0922 NORDcanopy aSAP 1 4 Connecting the supply chamber 1 5 Flipping the canopy 1 6 Supporting the side on a modular canopy C1 Gx10 H G M4 16 M5 10 F1 Flip 180 F1 Gx12 H G M4 16 M5 10 F1 ...

Страница 5: ...e for illustrative purposes We reserve the right to make changes RDM 035 0922 5 NORDcanopy aSAP 1 7 Assembling the lighting fixture 1 8 Assembling the ceiling panel H G M4 16 M5 10 D1 Hx4 E1 Hx4 H G M4 16 M5 10 ...

Страница 6: ...www etsnord com 6 RDM 035 0922 NORDcanopy aSAP 1 9 Blind panel installation on the filter rail of the HU Steam canopy Gx2 ...

Страница 7: ...hting 7 Exhaust air connection 8 Adjustment plate for exhaust air 9 Front panel 10 Front panel lock 11 AirGrip air nozzle system 12 Airflow measuring nozzles 13 HFK grease filter 14 Grease collection container 15 Blind plate for grease filter rail A Loop nut B Ozone duct for HZ canopy C Ceiling panel for modular connection D Grease collection container E Blind plate for grease filter rail F HFK Gr...

Страница 8: ...l Optional With larger canopies removing the center ceiling panel can provide better access for exhaust duct and insulation installation B B 96 L 30 L 50 L2 30 240 180 L2 25 L1 25 L 50 40 48 15 48 Safety It is prohibited to hold or add additional weight on the top of the canopy ...

Страница 9: ...35 0922 9 NORDcanopy aSAP 2 2 Hanging the kitchen canopy and ozone duct installation 2 3 Leveling the canopy Is performed for each module 2 4 Opening the front panel B A Note The panel locks automatically At the end of the installation make sure that the panels are correctly fixed ...

Страница 10: ...chen canopy modules together 2 5 1 Hanging the canopy modules Each module has to be suspended at least from four anchor points 2 5 2 Sequential connection 2 5 3 Installation of the ceiling panel between the modules x4 5x G 6x G A B C D E F G M5 10 H H G M5 10 4x H C ...

Страница 11: ...RDM 035 0922 11 NORDcanopy aSAP 2 5 4 Fastening sides back to back Requires additional bolt holes 2 6 Installing grease collection containers and blind panels for the grease filter rail 2 7 nstalling HFK grease filters 4x Ø6mm 4x G A B C D E F G M5 10 H M4 16 H G M5 10 E D F ...

Страница 12: ... RDM 035 0922 NORDcanopy aSAP 2 8 Installing the ozonator Connecting and starting the ozonator is described in the Ozonator Installation and Maintenance Manual 2 9 Lighting connection Note PERFORMED BY ELECTRICIAN PE N L ...

Страница 13: ...factor per 1 m of front panel SPx0 SPx1 SPx2 SPx3 SPxK Front panel 19 2 32 3 50 4 AirGrip 2 4 Side panel 6 6 The supply panel k factors above include the AirGrip air capture system K factor If the side panel has perforation add the side panel k value to the front panel k value Calculation example Supply air canopy L 2 meter with SPx2 front panel Calculation of the supply air volume Pressure in the...

Страница 14: ...ww etsnord com 14 RDM 035 0922 NORDcanopy aSAP 4 Accessories 4 1 Installation of cover plates 4 2 Grease filter removal tool Use the Helping Hand filter tool for easy filter handling C x2 x8 x2 B x4 x8 A ...

Страница 15: ...en canopy including light fixtures are cleaned using neutral cleaning agents Carefully rinse the surfaces after cleaning in order to avoid harmful interactions of cleaning agents and high temperatures To clean the exhaust chamber HFK filters and grease collection containers are removed from the kitchen canopy To clean the supply chamber the front panel of the kitchen canopy is removed ATTN Do not ...

Страница 16: ...raitti 4 04360 Tuusula Finland Phone 358 40 18 42 842 info etsnord fi www etsnord fi ETS NORD Sweden Address Järsjögatan 7 69235 Kumla Sweden Phone 46 19 554 20 50 info etsnord se www etsnord se Address Pinjegatan 5 21363 Malmö Sweden Phone 46 40 94 68 70 info etsnord se www etsnord se ETS NORD International info etsnord com www etsnord com ...

Отзывы: