
Instruction for use Nova freshbrew FT
13
© ETNA Coffee Technologies b.v.
C O F F E E T E C H N O L O G I E S
2.4
Principle of operation
After a selection is made, the drink is prepared and dispensed.
•
The water is supplied via the boiler (heated).
•
Instant products are dosed from the containers into the mixer and/or
the ground coffee is dosed into the brewing group.
•
The water and the ingredients are mixed in the mixer or
compressed by the brewing group.
•
The drink is dispensed through the dispensing pipe into the cup
placed on the cup stand.
•
The cup stand has two sides; hot water on the left, drinks on the
right.
•
The start button can be used when a drink has been selected and a
cup has been placed.
2.5
Switching ON and OFF
The machine does not have a manual on/off switch. The key switch
used to open the door incorporates the on/off switch:
•
When the door is opened the machine switches itself off.
•
When the door is closed the machine switches itself back on.
2.6
Service key
Once the service key has been inserted and turned a quarter turn, the
machine is operational for repair and test purposes.
The machine contains rotating and moving parts. Ensure
that your fingers do not become trapped when work is
carried out.
Figure 2-4