8
9
www.ETiSSL.com
Please contact 1-855-384-7754 for further assistance.
suspension Mounting (continued)
4
Attaching the light to chain
□
If using chains to suspend the fixture from the ceiling, attach an S
hook (HH) to the bottom of the mounting chain (GG) and then to the V
clip (DD) near the end of the fixture body (B). Repeat this step on the
other side of the fixture.
□
Hang the fixture body (B) by placing one chain over each hook (not
included) that has been installed on the ceiling.
□
Adjust chains to level light.
noTe:
Product should be suspended using metal chain or cable and
hooks with weight bearing capacity exceeding 11 lbs (5 KG).
noTe:
If using eye hooks in the ceiling instead, attach the top of the
chain with additional S hooks (HH).
5
Activating the fixture
□
Restore the power supply to turn on the light.
surface Mounting
With power disconnected to the electrical box, remove the existing fixture. Make a sketch of how the current fixture is wired (by wire color
or mark the wires with masking tape and a pencil so you will know how to properly reconnect the wires to the new LED light fixture.
2
Completing the installation
□
Snap the fixture body (B) into the U brackets (CC) installed on the mounting surface.
□
Restore the power supply to turn on the light.
surface Mounting (continued)
Linking Fixtures
WarninG:
RISK OF ELECTRIC SHOCK. Disconnect power to the vapor tight light before linking additional fixtures.
WarninG:
Provide power to the fixtures only after all linking connections have been made.
□
Multiple vapor tight lights can be connected, up to a maximum of 7 fixtures. Only the first light fixture needs to be direct wired to an
electrical box.
□
Use a flathead screwdriver to remove a knock out hole on the end of the fixture body (B).
□
Connect additional black, white, green, purple, and gray wires to those from the power source and the electrical box on the first
fixture.
□
Feed the wires into a connector plug or through the knock out hole on the end of the fixture body (B), depending on the wiring
method preferred by the installer.
noTe:
If feeding the wires through the knock out hole, an additional cord grip (not included) will be required.
B
BB
CC
AA
CC
B
B
A
Knock out holes
HH
GG
1
Installing the U brackets
□
Hold the U brackets (CC) up to the mounting surface to determine the
mounting position.
noTe:
The U brackets (CC) should be positioned 33 inches apart.
□
Mark the screw positions for the U brackets (CC) on the mounting
surface.
□
Drill a 1/8 in. pilot hole into the screw locations marked on the ceiling.
You can also use an awl or nail to dimple the screw holes.
□
Install a drywall anchor (BB) in each drilled mounting hole.
□
Insert two mounting screws (AA) through the U bracket (CC) and into
the drywall anchors (BB) installed in the mounting surface.
□
Tighten each mounting screw (AA) to secure the U bracket (CC) to the mounting surface.
□
Repeat the installation for the second U bracket (CC).
DD
CC
EE
CC
B
Cord grips
A