background image

EX42200                                        www.etherwan.com 

Alarms for Power and Port Link Failure

 

Step 1: There are three pins on the terminal block are used for power failure 

detection. It fully supports normal open and normal close. Use this 
as a dry contact application to send a signal for power failure 
detection.

 

 

Power Input Assignment 

 

18~57VDC 

Power1 

 

Power Ground 

 

18~57VDC 

Power2 

 

Power Ground 

 

Earth Ground 

Terminal Block 

Relay Output Rating 

1A @ 250VAC 

Relay Alarm Assignment 
Default is Power1 and Power2 both off. 
Point 1 & 2 is close and Point 2 & 3 is open. 

 

Relay Contact  Power1 Power2 Point 1 & 2 Point 2 & 3 

Start Alarm 

Off 

Off 

Close 

Open 

Start Alarm 

Off 

On 

Close 

Open 

Start Alarm 

On 

Off 

Close 

Open 

Non-Alarm On  On  Open 

Close 

  17

Содержание EX42200

Страница 1: ...by space Physical Description The Terminal Block and Power Inputs Power Input Assignment 18 57VDC Power1 Power Ground 18 57VDC Power2 Power Ground Earth Ground Terminal Block Relay Output Rating 1A 250VAC Relay Alarm Assignment Default is Power1 and Power2 both off Point 1 2 is close and Point 2 3 is open DC Terminal Block Power Inputs There are two pairs of power inputs can be used to power up th...

Страница 2: ...nput Receive Data 4 PoE Positive VCC 5 PoE Positive VCC 6 RD Input Receive Data 7 PoE Negative VCC 8 PoE Negative VCC 2 The 100Base FX Connections The fiber port pinouts The Tx transmit port of device I is connected to the Rx receive port of device II and the Rx receive port of device I to the Tx transmit port of device II 3 The WDM 100Base BX Connections The fiber port pinouts Only one single opt...

Страница 3: ...EX42200 www etherwan com The Port Status LEDs 3 ...

Страница 4: ...ed LINK ACT Flashing Transmitting or receiving data ACT stands for ACTIVITY Steady Valid port connection at 100Mbps 10 100 Off Valid port connection at 10Mbps Steady Powered device PD is connected PoE Off Powered device PD is disconnected 100Base FX BX Steady A valid network connection established LINK ACT Flashing Transmitting or receiving data ACT stands for ACTIVITY Steady Valid port connection...

Страница 5: ...sses Provides 448K bits buffer memory Alarms for power failure by relay output Fully supports normal open and normal close Redundant dual 18 to 57VDC Terminal Block power inputs Device power consumption 14W Max without PoE PoE power budget 120W Max Operating temperature ranges from 40 to 75 40 to 167 tested for functional operation 40 to 85 40 to 185 Supports DIN Rail installation Assembly Startup...

Страница 6: ...EX42200 www etherwan com 6 ...

Страница 7: ...er over Ethernet PoE Power Sourcing Equipment PSE and can detect an IEEE802 3at compliant Powered Device PD Using external 18 57VDC power inputs through Terminal Block data and power can be transmitted to a Powered Device PD over the same twisted pair Ethernet cable through port 1 to port 4 on the Switch This manual describes how to install and use the Hardened PoE Ethernet Switch This switch inte...

Страница 8: ...ANTLING 5 PREFACE 7 TABLE OF CONTENTS 8 PRODUCT OVERVIEW 9 HARDENED POE ETHERNET SWITCH 9 PACKAGE CONTENTS 9 PRODUCT HIGHLIGHTS 10 Basic Features 10 FRONT PANEL DISPLAY 11 PHYSICAL PORTS 13 INSTALLATION 14 SELECTING A SITE FOR THE SWITCH 14 DIN RAIL MOUNTING 15 CONNECTING TO POWER 16 Redundant DC Terminal Block Power Inputs 16 Alarms for Power and Port Link Failure 17 CONNECTING TO YOUR NETWORK 18...

Страница 9: ...oE Ethernet Switch Package Contents When you unpack the product package you shall find the items listed below Please inspect the contents and report any apparent damage or missing items immediately to your authorized reseller This Switch User s Manual 9 ...

Страница 10: ... 3 802 3u 802 3x 10 100Mbps Full Half duplex Auto Negotiation Auto MDI MDIX 100Base FX Multi Single mode SC or ST type 100Base BX WDM Multi Single mode SC type Supports 2048 MAC addresses Provides 448K bits buffer memory Alarms for power failure by relay output Fully supports normal open and normal close Redundant dual 18 to 57VDC Terminal Block power inputs Device power consumption 14W Max withou...

Страница 11: ...EX42200 www etherwan com Front Panel Display 11 ...

Страница 12: ...tablished LINK ACT Flashing Transmitting or receiving data ACT stands for ACTIVITY Steady Valid port connection at 100Mbps 10 100 Off Valid port connection at 10Mbps Steady Powered device PD is connected PoE Off Powered device PD is disconnected 100Base FX BX Steady A valid network connection established LINK ACT Flashing Transmitting or receiving data ACT stands for ACTIVITY Steady Valid port con...

Страница 13: ...hysical Ports This switch provides Five 10 100Base TX ports Four 10 100Base TX ports one 100Base FX BX port CONNECTIVITY RJ 45 connector on TX ports SC or ST connector on 100Base FX fiber port SC connector on 100Base BX fiber port ...

Страница 14: ...ic interference Specifically the site you select should meet the following requirements The ambient temperature should be between 40 to 75 degrees Celsius The relative humidity should be less than 95 percent non condensing Surrounding electrical devices should not exceed the electromagnetic field RFC standards Make sure that the switch receives adequate ventilation Do not block the ventilation hol...

Страница 15: ...e to the back panel of the switch Installation Place the switch on the DIN rail from above using the slot Push the front of the switch toward the mounting surface until it audibly snaps into place Removal Pull out the lower edge and then remove the switch from the DIN rail 15 ...

Страница 16: ... power inputs can be used to power up this device You only need to have one power input connected to run the switch Step 1 Connect the DC power cord to the plug able terminal block on the switch and then plug it into a standard DC outlet Step 2 Disconnect the power cord if you want to shut down the switch 16 ...

Страница 17: ...a signal for power failure detection Power Input Assignment 18 57VDC Power1 Power Ground 18 57VDC Power2 Power Ground Earth Ground Terminal Block Relay Output Rating 1A 250VAC Relay Alarm Assignment Default is Power1 and Power2 both off Point 1 2 is close and Point 2 3 is open Relay Contact Power1 Power2 Point 1 2 Point 2 3 Start Alarm Off Off Close Open Start Alarm Off On Close Open Start Alarm O...

Страница 18: ...d cabling requirements Cable S ecifications p Speed Connector Port Speed Half Full Duplex Cable Max Distance 10Base T RJ 45 10 20 Mbps 2 pair UTP STP Cat 3 4 5 100 m 100Base TX RJ 45 100 200 Mbps 2 pair UTP STP Cat 5 100 m 100Base FX SC ST 200 Mbps MMF 50 or 62 5μm 2 km 100Base FX SC ST 200 Mbps SMF 9 or 10μm 20 or 40 km 100Base BX SC 200 Mbps MMF 50 or 62 5μm 2 or 5 km 100Base BX SC 200 Mbps SMF ...

Страница 19: ...tep 2 Prepare cable with corresponding connectors for each type of port in use Step 3 Consult the previous section for cabling requirements based on connectors and speed Step 4 Connect one end of the cable to the switch and the other end to a desired device Step 5 Once the connections between two end devices are made successfully turn on the power and the switch is operational ...

Страница 20: ... 100Base FX BX 4 pair UTP STP Cat 3 4 5 4 pair UTP STP Cat 5 Up to 100m 328ft MMF 50 or 62 5μm SMF 9 or 10μm LED Indicators Per unit Power status Power 1 Power 2 Alarm Per port 10 100TX LINK ACT 100 PoE 100FX BX LINK ACT 100 Dimensions 61mm W 73mm D 110mm H 2 4 W x 2 87 D x 4 33 H Net Weight 0 6Kg 1 32lbs Power Terminal Block 18 57VDC Power Consumption Device 14W Max without PoE PoE power budget 1...

Страница 21: ...N61000 4 4 Burst Standards EN61000 4 5 Surge Standards EN61000 4 6 Induced RFI Standards EN61000 4 8 Magnetic Field Standards Environmental Test Compliance IEC60068 2 6 Fc Vibration Resistance IEC60068 2 27 Ea Shock FED STD 101C Method 5007 1 Free Fall with package ...

Отзывы: