background image

4

Molift MRS Duo / www.etac.com 

Safe Working Load (SWL)

 

300 kg (661 lbs) 

Weight of unit

 

Post (complete): 14,8 kg/30,9 lbs

 

Boom Kg/m: 4,2 kg/m/8,8 lbs/m

 

Foot: 3,8 kg/6,6 lbs

 

Post (without foot): 11 kg/24,3 lbs

 

Total weight (2 posts and boom):

 

 

38-44,3 kg/83,8-97 lbs

Available boom lengths (A):

 

2m - 2,5m - 3m - 3,5 m

Dimensions:

 

Width (D): 2,15 - 3,65 m

 

Height (B): (4 steps x 100mm) 2,25-2,55 m

 

Depth (E):1,2m

 

Max internal space (AxC): 3,5x2,4m

 

Transport height: 1,7 m

Material:

 

Anodized aluminum, Plastic

Expected Lifetime:

 

The MRS Duo has an expected lifetime of         

 

10 years

Technical Data

A

B

C

E

D

Содержание 1600013

Страница 1: ...MRS Duo EN User manual BM20001 Rev B 2014 11 13...

Страница 2: ...sinfection 9 Reconditioning 9 Recycling 9 Spare parts 9 Periodic Inspection 9 Pericodic Inspection Scope 9 Troubleshooting 10 Important This User Manual contains important safety instructions and info...

Страница 3: ...step adjustable posts from 2 25 to 2 55 meters Boom ranges from 2 to 3 5 meters and the lifting capacity is 300 kg 661 lbs It is ideal for hospitals and institutional in environments where permanent...

Страница 4: ...535 2006 Conditions for Use Lift and transfer of a person will always pose a certain risk and only trained personnel are allowed to use the equipment and accessories covered by this user manual Modifi...

Страница 5: ...oot 11 kg 24 3 lbs Total weight 2 posts and boom 38 44 3 kg 83 8 97 lbs Available boom lengths A 2m 2 5m 3m 3 5 m Dimensions Width D 2 15 3 65 m Height B 4 steps x 100mm 2 25 2 55 m Depth E 1 2m Max i...

Страница 6: ...t bolts trough holes and washer in boom 3 Use allen key located in top of post to screw in bolts 4 Make sure both bolts are properly fastened Do not stand under the boom when mounting use a stand or s...

Страница 7: ...liftmotor does not hit the post 3 Use allen key located in top of post to screw in bolts Mounting charger to post 1 Remove plugs from holes on the post 2 Use the small allen key located in top of pos...

Страница 8: ...ever leave a user unattended in a lifting situation Transport 1 Secure trolley se page 6 fastening end stop temporarily 2 Remove quick release bolt and lower MRS Duo 3 Place the quick release bolt in...

Страница 9: ...300 Molift Air 205 Propulsion Molift Air 300 Propulsion Trolley for Molift Air MRS Trolley Basic Art no 2520000 MRS Trolley Propulsion Art no 2500103 Molift Nomad Molift Nomad portable hoist is suita...

Страница 10: ...eport for MRS Duo This can be found on www etac com In the event of danger to safety the MRS Duo shall immediately be taken out of service and marked clearly with out of order and shall not be used un...

Страница 11: ...re properly fastened Controll bolts between bracket and post Make sure bolts is properly fastened MRS Duo jams when lowering boom to transport position Quick release bolt is already inserted in bottom...

Страница 12: ...Etac AS Etac Supply Gj vik Hadelandsveien 2 2816 Gj vik Norway Tel 47 4000 1004 molift etac com www etac com...

Отзывы: