
Empty the ash box
19
Inspect the seal on the ash box lid to ensure it is in
good order, and replace it if necessary.
Fig. 5-3: Seal
Inspect the integrity of the ash box seals on the boiler,
replace them if necessary.
Fig. 5-4: Seal
Attaching the ash box to the boiler
Reattach the cover of the ash box and secure with the
fasteners. Push the ash box over the connection on
the boiler and attach it to the boiler with the fasteners.
Switching on the boiler
Switch the boiler back on with the On/Off
switch.
Содержание HACK 20
Страница 1: ...2017 01 30 EN 0000000294 V 003 2 38 0 3005 3106 93526 001 Wood chip boiler 20 90 kW Operation ...
Страница 15: ...Changing the fuel Settings 15 4 2 Settings ...
Страница 35: ...ETAtouch controller Boiler function block HACK 35 ...
Страница 45: ...ETAtouch controller Buffer function block 45 ...
Страница 49: ...ETAtouch controller Hot water tank function block 49 ...
Страница 53: ...ETAtouch controller Fresh water module function block 53 ...
Страница 67: ...ETAtouch controller Solar function block 67 ...
Страница 73: ...ETAtouch controller Heating pipeline function block 73 ...
Страница 92: ...www eta co at www eta co at downloads DOWNLOAD ...