Cleaning and maintenance
Maintenance (expert)
37
Adjustment requires the removal of the combustion
chamber door. To do this, lift the combustion chamber
door slightly when it is open, unhook it and carefully
place the door next to the boiler.
1
Closing roller holder
2
Hinge
Loosen the flange nuts (top and bottom) on the hinge
and the closing roller holder and evenly reduce the gap
(only slightly) to the boiler.
Fig. 2-95: Reduceing the gap
Retighten the flange nuts. Suspend the door and
check whether it now closes fully. If not, repeat the
process.
Fig. 2-96: Check
Always adjust the hinges and the closing roll-
er mount so that the seal is evenly compressed.
Содержание ePE-K 100-130 kW
Страница 1: ...2019 10 30 EN 0000000441 V 004 3 47 0 5203 00 939067 002 Pellet boiler ePE K 100 130 kW Service manual...
Страница 7: ...Cleaning and maintenance Maintenance notes 7...
Страница 42: ...www eta co at...
Страница 43: ......
Страница 44: ...www eta co at www eta co at downloads DOWNLOAD...