ES-220 RACK CONVEYOR DISHWASHER – JUNE 2011
5
I
NSTALLATION
1.3
1.
Remove the packing materials from the machine, including inside
the chambers.
2.
Remove the lower panels, position the machine and level by
screwing the adjustable feet.
3.
Connect the 2” B.S.P. gravity drains via 2” traps to the drain outlets.
4.
Connect the hot water to the
1
/
2
” B.S.P. inlet valve, located under the
main wash tank, via an isolating valve (supplied by others). The hot
water supply must be at least 60
O
C and between 200 to 400kPa. A
pressure reducing valve must be fitted for pressure above 400kPa.
The pressure reducing valve is to be supplied by others.
Note that all plumbing work is to be done in accordance with local
plumbing codes.
5.
Ensure that the rotary switch is “OFF”, open the top of the control
panel and connect the 3-phase power to L1, L2 and L3. Then
connect neutral to “N” on the terminal block and connect the earth
wire to the earth terminal. An isolating switch is also required beside
the machine.
Note that all electrical work is to be done according to the rating
plate on the right hand side of the Control Box.
6.
Connect the benching to either end of the machine so that there is a
fall back towards the machine to allow the water to drain back