background image

 

[

键入文字

6. Routine maintenance work 

 

In order to ensure the long-term stable operation of the equipment, the operator should pay 

attention to the regular inspection and daily maintenance of the equipment. During the equipment 
maintenance process, it can only be carried out after the power is cut off. 
The basic contents of daily maintenance work are as follows: 
1. The equipment should be installed in a ventilated and dry environment to prevent high 
temperature and humidity from affecting the operation of the equipment; 
2. When the equipment is running, it is strictly forbidden to put the liquid in the semi-sealed state 
on the conveyor belt to avoid the liquid from being spilled. 
To the inside of the device, cause a short circuit and burn out the accessories; 
3. It is strictly forbidden to place overweight items on the conveyor belt to avoid overload 
operation and damage the electric drum; 
4. It is strictly forbidden to place ultra-wide or ultra-high items on the conveyor belt to prevent 
items from getting stuck in the detection channel; 
5. Regularly remove dust and foreign objects on the conveyor belt and lead curtain; 
6. In order to extend the service life of the electric drum, the electric drum should be avoided from 
idling for a long time; 
7. For equipment that has been stored for a long time (more than one month) and is not in 
operation, the user should warm up the equipment for 10 minutes after turning on the equipment 
before scanning. 
8. Avoid sharing the power supply between the equipment and other large equipment, so as not to 
affect the normal operation of the equipment; 
 

Содержание eBS-5030A

Страница 1: ...www esslsecurity com USER MANUAL eBS 5030A...

Страница 2: ...n it is powered on Do not put any living body parts or living animals into the tunnel when the Machine is operating Do not allow liquids to flow into the Machine while it is working Turn off the Machi...

Страница 3: ...e Read this manual before you install and use the Machine 2 SafetyInstructions Before operating the Machine you need to learn the meaning and location of the safetywarning signs on the Machine Table 2...

Страница 4: ...the items after inspection Normally the tray is installed at the exit of the tunnel 4 Power OnandStartup 4 1 Preparation When you receive the Machine check the wooden box If the package has any abnor...

Страница 5: ...tton Start the Machine 4 Emergency stop button Immediately stop the X ray source and conveyor belt if an emergency occurs 5 Indicator Green Power indicator Red X ray indicator Hardware Operation Step...

Страница 6: ...pped The Machine is on and the power indicator is on but the roller is not running Running The Machine is on the power indicator is on and the electric roller is running Scanning The Machine is on and...

Страница 7: ...or engineer and administrator Displaysthenumberofscannedbaggage Displays the current devicestatus Displaysthecurrentsystemdateandtime The system will produce low quality images after the Machine has w...

Страница 8: ...have high density such as lead and steel or are very thick Low Penetration Increase image contrast of bright areas These bright areas correspond with penetrable materials with a low X ray absorption...

Страница 9: ...brightness The grade in the system ranges from 5 to 5 Image Scan Change the brightness of images by adjusting gray values The image changes from bright to dark and dark to bright automatically With th...

Страница 10: ...tunnel entrance Set the value to 0 if you do not need the conveyor belt to run automatically Image Flip 0 Disable 1 Enable Displays the image upside down Engineer Enter the password to access permiss...

Страница 11: ...yscanned images by date selecting JPEG Select the format of the images to be exported We recommend Select the path to store exported files 5 4 4 FunctionCombinationKey Customize image processing funct...

Страница 12: ...the device cause a short circuit and burn out the accessories 3 It is strictly forbidden to place overweight items on the conveyor belt to avoid overload operation and damage the electric drum 4 It i...

Страница 13: ...24 Shambavi Building 23rd Main Marenahalli JP Nagar 2nd Phase Bengaluru 560078 Phone 91 8026090500 Email sales esslsecurity com www esslsecurity com...

Отзывы: