Esse 200XK Скачать руководство пользователя страница 12

Page 12 

200-XK-I06-201217 

INSTALLING THE STOVE 

 
INSTALLING THE AIR INLET CONNECTION 
 
Ventilated air may be supplied directly from the outside via a 3”/Ø80.0mm heat 
resistant pipe connected to the rear of the stove.  This air inlet may be positioned 
downwards or backwards (see Fig. 5).  To re-position the air inlet, undo four screws, as 
shown on Fig. 5, re-position the air inlet bracket and replace screws. 
 

 

If rearrangement of the air inlet connection is needed it must be made 
before the stove is positioned in the fireplace. 

 
POSITIONING 
The overall dimensions of the stove are shown in Fig. 3 along with a table that indicates 
recommended distances between the stove and surrounding combustible materials. As 
a rule, any surrounding combustible material should not exceed 80°C. There should be 
sufficient space around the stove for service work. 
 
HEARTH 
The construction of the hearth must conform to Building Regulations, must be firm, non-
combustible and capable of supporting the stove. (Refer to Building Regulations 
Document J).  The stove has been independently certified as suitable to stand on a 
12mm (½”) thick non-combustible hearth. 
 
FLUE CONNECTION 
The flue pipe used to connect the stove to the chimney is 125mm (5") in diameter. The 
stove is supplied ready for top flue connection. To change to a rear connection, a cast 
rear flue collar kit or a rear flue box kit is available from www.esse.com.  The flue 
blanking plug supplied with the kits is used to block the top flue outlet. The blanking 
plate in the rear of the stove must then be removed (to access the bolts attaching the 
blanking plate, the convector panel must first be removed) - see Fig. 6. The rear flue box 
attachment allows the stove to be installed further out of any building recess. Fig. 1 
shows suitable flue connections. 
 
IMPORTANT INSTALLATION NOTES 
1.

 

The installation must allow for adequate chimney sweeping. 

2.

 

Avoid using bends greater than 45° to the vertical. All flue pipe sections should be 
as close to vertical as possible. 

3.

 

All joints in the flue system must be effectively sealed. 

4.

 

All flue sockets must face upwards. 

5.

 

Check the appliance for soundness of seals between castings and main components 
and that all supplied parts and fittings are correctly fitted. 

 
On completing the installation, check that all the internal components of the stove are 
positioned correctly. 
Check - Ashpan, iron grate, baffle, side and back bricks. 

Содержание 200XK

Страница 1: ...200XK 200XK DD 225XK Multi Fuel Smoke Exempt Wood Burning Stove INSTALLATION USER INSTRUCTIONS TO BE LEFT WITH THE CUSTOMER UK IRELAND GB IE...

Страница 2: ...ntilate the room Let the fire burn out or eject and safely dispose of fuel from the appliance Once the fire is cold check the flue and chimney for blockages and clean if required Do not attempt to rel...

Страница 3: ...nd In Scotland and Wales this power rests with Ministers in the devolved administrations for those countries Separate legislation the Clean Air Northern Ireland Order 1981 applies in Northern Ireland...

Страница 4: ...n 320cm 200mm If a flue liner is used it should be 125mm diameter 5 and suitable for solid fuel Be a minimum 4 5m high from hearth level to pot Be terminated at least 1m above roof level so that the c...

Страница 5: ...Page 5 200 XK I06 201217 Fig 1 Ideal Flue Connections Flue box available from www esseparts com Fig 2 Chimney and Flue Performance...

Страница 6: ...should now be taken with the primary air intake closed and the airwash control fully open MAXIMUM The primary air intake can now be opened to allow the stove to burn at maximum rate Give the stove so...

Страница 7: ...reduce the draught through the stove if the flue draught is too high The flue stabiliser should be Fitted in the same room as the stove The same size as the flue pipe Fitted no closer than 700mm to th...

Страница 8: ...Page 8 200 XK I06 201217 Fig 3c 200 Stove with Optional Log Box Dimensions...

Страница 9: ...Page 9 200 XK I06 201217 Fig 3c 225 Stove Dimensions...

Страница 10: ...o Installation Engineer Company Name Address Telephone No Commissioning Checks to be completed and signed Is the flue system correct for this appliance Yes No Flue swept and checked for soundness Yes...

Страница 11: ...olid Fuel Boilers and Packages of Solid Fuel Boilers Supplementary Heaters Temperature Controls and Solar Devices Esse 200SE Note The product fiche can cover a number of solid fuel boiler models suppl...

Страница 12: ...m thick non combustible hearth FLUE CONNECTION The flue pipe used to connect the stove to the chimney is 125mm 5 in diameter The stove is supplied ready for top flue connection To change to a rear con...

Страница 13: ...for Top or Rear Outlet 200 Stove rear flue connection conversion The stove is supplied ready for a top flue connection 1 Unfasten the flue blanking plate 2 Using the same bolts fasten either the optio...

Страница 14: ...ir inlet bracket Fitting the Optional Log Box Remove the stove legs The stove can then be carefully sat on top of the log box The stove can then be bolted to the base using the bolts from the stove le...

Страница 15: ...It is essential that the fire has adequate air supply for combustion and ventilation Apertures provided for this purpose shall not be restricted Additional loose parts supplied inside your stove inclu...

Страница 16: ...Page 16 200 XK I06 201217 Fig 7 Riddling Grate Open Fig 8 Riddling Grate Closed Fig 9 Positioning Vermiculite Bricks...

Страница 17: ...here are too few embers in the fire bed add suitable kindling to prevent excessive smoke FUEL OVERLOADING The maximum amount of fuel specified in this manual should not be exceeded overloading can cau...

Страница 18: ...When reviving a low fire it is important to also use kindling before adding larger logs to help prevent smoke Wood burns most efficiently when the air for combustion is supplied from above the fire be...

Страница 19: ...s coming from the end grain of the wood will dirty the glass TYPES OF WOOD FOR FUEL For best results use well seasoned hardwood such as Oak Ash or Beech Allow wood to dry out under cover in well venti...

Страница 20: ...in order to hit the stove back up to temperature and drive off the moisture and gases in the fuel If a lot of smoke is produced on reloading the air wash control can be opened further to keep the smo...

Страница 21: ...ON Normal heat output wood 7 6kW Nominal heat output solid mineral fuel 7 1kW Weight of stove 99kg Minimum chimney draught 12Pa Mean flue gas temperature wood 229 C Mean flue gas temperature solid min...

Страница 22: ...Page 22 200 XK I06 201217...

Страница 23: ...e grate and ash pan and use a vacuum cleaner nozzle to clean ash from the base of the stove Remove the baffle plate and brush the flue ways Close the door and open the air inlets fully This action wil...

Страница 24: ...rns to our attention We will assess the nature of the complaint and either send replacement parts for your dealer to fit or arrange for an ESSE engineer to inspect the appliance and carry out any work...

Страница 25: ...Monmouth NP25 3LX 01446 771567 info topstak co uk 01600 711710 info topstak co uk Esse Woodburning and Multifuel stoves supplied by Topstak www topstak co uk stoves sto ves by brand esse stoves We ha...

Отзывы: