SGOES Infrared Combustible Gas Detector
820-0006
Operating Manual
Page 15
Step 4- Wire Preparation
Figure 4-6: Wire Prep
Use a stripping tool for the selected wire gauge to remove ¼-inch (6mm) of the insulating jacket for
each conductor to be inserted in the terminal blocks of the Connector PCBA.
Caution: All cable/conduit entries must be sealed with an appropriate and certified sealing plug
and cable gland. The use of industrial grade, armored field cable is recommended. If installing
the SGOES in a hazardous area, armored cabling is required.
Step 1- Remove Conduit Plug
Using the supplied M16 hex wrench,
loosen and remove one of the
threaded conduit plugs
Step 2- Remove the rear cover
Step 3-
Attach conduit gland (user
supplied) to 3/4” threaded opening on
detector body. Adapt as necessary to
user’s conduit size, using standard
industry
practices.
¼” (6mm)
Shielded 14 or 16 AWG Stranded wire
(Recommended) based on cable length
6mm Insulated Crimp On Ferrule
ESP safety recommends a ferrule that is
crimped onto the wire for better
connectivity and ease of insertion into
the terminal block.
Содержание SGOES
Страница 1: ...SGOES Infrared Hydrocarbon Gas Detector Operating Manual 820 0006...
Страница 33: ...SGOES Infrared Combustible Gas Detector 820 0006 Operating Manual Page 32 Appendix 6 HART Menu Tree...
Страница 34: ...SGOES Infrared Combustible Gas Detector 820 0006 Operating Manual Page 33 Appendix 7 SGOES to VECTOR FCU...
Страница 35: ...SGOES Infrared Combustible Gas Detector 820 0006 Operating Manual Page 34 Appendix 8 SGOES to UPES...