Eskridge 600 Скачать руководство пользователя страница 6

Model 600 Spindle Drive service manual, SM600LS2-AG Page 5

Eskridge, Inc. Olathe, Ks. 913-782-1238                                                                                                                                    www.eskridgeinc.com

plete buildup of unit.

Unit Reassembly

1) 

Install the secondary carrier assembly onto the output shaft; 
aligning the splines of the carrier 

(5)

 with the output spindle 

(3)

 splines and centering the three threaded holes in the ouput 

spindle between the planet gears. Once aligned slide the car-
rier onto the spindle.

2) 

Install carrier retaining plate 

(47)

 & secure using provided 3/8-

24 Flathead capscrews 

(48).

 If using thread locking compound 

to assist in screw retention, apply only a small amount to inter-
nal threads. Use of excess thread lock may cause screws to be 
irremovable once compound has cured.

3) Lubricate 

o-ring 

(33)

 and install on the ring gear 

(7) 

pilot. 

Caution: Hold ring gear by outside diameter or use lifting device 
to prevent injury.

4)  Align the gear teeth of secondary ring gear 

(7)

 with 

the gear teeth of the planet gears 

(11)

 and place 

ring gear on base aligning mounting holes of ring 
gear with holes in base. Use the scribed line made 
during disassembly for reference. With carrier in place, install 
secondary sun gear.

Simple Planetary Primary, for compound primary skip to step 5C

5S) 

Install primary ring gear (with lubricated o-
ring in place), align mounting holes of ring gear 
with holes in base using the scribed line made 
during disassembly for reference. Install the primary carrier as-
sembly aligning gear teeth of ring gear with those of the planet 
gears and place on base. Install the input gear 

(17)

.

Compound primary (76:1 ratio and up):

5C)

 

a)  The planet gears will now need to be timed. Refer to the 
diagram appropriate for your unit’s gear ratio (at right). The 
planet gears each have a timing mark, usually a  round punch 
mark stamped into the surface which is shown as a circle on 
the diagram.

b)   As seen from above, start with the top planet gear with 

it’s timing mark pointing straight down. Next, rotate the 
lower left planet gear counterclockwise as indicated in the 
timing diagram.  Then rotate the lower right planet gear 
clockwise as indicated. 

c)   Set the input gear 

(17)

 and the input thrust race 

(32)

 into 

the center of the primary planet carrier assembly.

d)   If compound primary ring gear 

(9)

 was not removed dur-

ing disassembly, then skip to step 7. Otherwise, bolt to the 
inside of the cover 

(2)

 with twelve bolts 

(45)

. Use a remov-

able thread locking compound on the threads of the bolts 

(45)

. Tighten to 110 ft.-lbs. dry or 80 ft.-lbs. lubricated.

e) 

Install primary ring spacer 

(10) 

w/ O-ring

 (33) 

in place.

6) 

Install the input to cover thrust washer 

(32)

 and carrier to cover 

thrust washers 

(31, 2ea; 30, 1ea) 

Refer to exploded view for 

details.

7) 

Noting the scribed line made during disassembly, (with lubri-
cated o-ring in place) align and install the cover 

(2)

.

8)  Install and torque the 20 3/4-10 hex-head cap-

screws 

(43)

 with lockwashers 

(46)

. The torque for the 

cap-screws: 380 ft-lb dry, 280 ft-lb if the fasteners are lu-
bricated.

9) 

Using a splined shaft to drive the input gear 

(17) 

ensure 

that the unit spins freely.

10)  Fill the unit to the proper level, as specified, with recom-

mended gear oil (refer to chart, page 3) after unit is sealed 
with brake and/or motor.

The gearbox is now ready to use.The gear drive is now 

ready to use.

Содержание 600

Страница 1: ...600LS2 AG WARNING While working on this equipment use safe lifting procedures wear adequate clothing and wear hearing eye and respiratory protection NOTE Individual customer specifications mounting case output shaft brake assembly etc may vary from exploded drawing and standard part numbers shown If applicable refer to customer drawing for details ...

Страница 2: ...TED LOAD N LOCK SHAFT RETENTION SYSTEM U S PATENT NO 5746517 MODEL 600L SPINDLE OUTPUT NOTES J BEARING PRELOAD DETERMINES QUANTITY OF SHIMS SEAL KIT P N 60 016 2101 INCLUDES 3 EA ITEM 33 O RINGS 1 EA ITEM 49 SEAL AND 1 EA ITEM 50 SEAL BOOT 58 X600LS2 AD DATE 06 13 07 EFFECTIVE S N 75300 UP EFFECTIVE DATE 06 19 07 UNITS MANUFACTURED PRIOR TO S N 75300 UTILIZE OBSOLETE P N 60 004 1301 FOR ITEM 22 US...

Страница 3: ... 60 004 1482 01 160 0500 01 103 0210 01 150 1580 01 207 0100 01 102 0190 01 103 0190 01 105 0510 01 112 0340 01 112 0350 60 004 1272 60 004 1352 01 150 1590 01 406 0020 01 207 0030 01 215 0010 01 406 0010 01 216 0030 01 201 0530 98 005 1141 60 004 1523 01 166 0350 1 2 139 76 1 110 08 1 PART NUMBER 60 004 4122L 60 004 3034 60 004 3044 PART NUMBER 60 004 4122L 60 004 3034 60 004 3044 60 004 1213 60 ...

Страница 4: ...140 synthetic Note Ambient temperature is the air temperature measured in the immediate vicinity of the gearbox A Gearbox exposed to the direct rays of the sun or other radiant heat sources will operate at higher temperatures and therefore must be given special consideration The max operating temp must not be exceeded under any circumstances regardless of ambient temperature Recommended ambient an...

Страница 5: ... heel bar or pull er if using a heel bar be sure not to pry against the cage of the inner spindle bearing 25 Remove the split ring segments 35 and shims 15 Caution Since the shaft is no longer positively retained care should be taken to avoid injury Care should also be taken not to damage it while pressing through base 2 Place base 1 exterior side down on a plate or table Press output shaft out bo...

Страница 6: ...e input gear 17 Compound primary 76 1 ratio and up 5C a The planet gears will now need to be timed Refer to the diagram appropriate for your unit s gear ratio at right The planet gears each have a timing mark usually a round punch mark stamped into the surface which is shown as a circle on the diagram b As seen from above start with the top planet gear with it s timing mark pointing straight down ...

Страница 7: ...Seals Installation Instructions courtesy Caterpillar Inc Seal Assembly Contents 2 Metal Seal Rings 2 Rubber Toric Rings Terminology 1 Seal Ring 6 Seal Ring Face 2 Rubber Toric 7 Seal Ring Ramp 3 Housing Retainer Lip 8 Seal Ring Retaining Lip 4 Housing Ramp 9 Installation Tool Optional 5 Seal Ring Housing Base Shaft 4 3 7 5 2 8 4 8 2 6 7 2 1 ...

Страница 8: ...nosol or any other liquid that leaves an oil film or does not evaporate quickly Inspection of Worn Seals Seals wear in an axial rather than radial direction as depicted in Figure Y The total thickness of the flange is usable wear ma terial on the formed seal rings and good seal performance can generally be expected until the flange is completely worn away Remaining service life can be estimated by...

Страница 9: ...f the toric will result in seal failure If correct installation is not apparent remove seal from the housing and repeat the process The rubber toric must never slip on the ramps of either the seal ring or the housing To prevent slippage allow adequate evaporation time for the lubricant before proceeding with further assembly Once correctly in place the rubber toric must roll on the ramp only 4 Wip...

Отзывы: