9910045 RevG April 2021
Appendix D (Continued)
Part Number: 5000423 & 2000930/2000830
PAGE
30
Step 3.
Install U-
bracket to MA Attachment using 3/8” nut
provided and tighten. Install torque clips onto the Bases and
align with pilot holes. Place MA Strut in center of U-Bracket and
align slots with torque clips. Tighten remaining connections as
shown.
MA Struts
may be installed in several possible array
locations.
ALERT:
See Sheet Title: Ballast Layout
–
XX in the Racking
Construction Set for installation locations of Mechanical
Attachments on each individual project.
Tip: Tighten M6 Bolt Connections before tightening 3/8”
connections to Roof Attachment.
Interior Location (Typical)
M6 Bolts
tighten
to
6ft-lb
3/8” connections
tighten to
21 ft-lb
MA Strut attaches to pilot
holes in center of Base
Torque Clip
Low Edge Location (Typical)
3/8” connections
tighten to
21 ft-lb
M6 Bolts
tighten to
6ft-lb
MA Strut attaches to pilot holes in
center of Base
Torque Clip
High Edge Installation Location (Typical)
3/8” connections
tighten to
21 ft-lb
M6 Bolts
tighten to
6ft-lb
MA Strut attaches to pilot
holes in center of Base
Torque Clip