Software
7.5.6 Compile Hardware Configuration
To load the hardware you have to select your PLC (
PLC_1 here)
in the field
Project tree / Devices.
Click on menu item
Compile
in the pull-down menu
and then
Hardware (rebuild all)
.
Please note that you must be still in offline mode for this.
Figure 18:
Compile Hardware
The configuration is compiled now. Continue to work offline!
Now the hardware can be downloaded in the PLC as described in the following.
Select your PLC (
PLC_1 here)
again and and further in the pull-
down menu
Download to device
and then
Hardware configuration
.
The Hardware is loaded now.
Figure 19:
Download hardware
(detail)
CPCI-DP-2S
Hardware Manual • Doc. No.: I.2322.21 / Rev. 1.2
Page 33 of 36