background image

5

IMPORTANT! Nylon washers (#5) adequately space

painted parts at all pivot points. Neglecting the use

of these washers will result in rusted parts.

NOTE: All board arms are made of rectangular tubing.

Tightening hardware too tight may damage tubing

and make adjustment of system difficult.

1.

Slide Right Post Ear (#44) and Left Post Ear (#45) behind

bracket on back of Post Assembly (#2). Using allen wrench

(#46)  provided,  secure  Right  &  Left  Post  Ears  to  bracket

using one Flat Head Bolt (#21), one flatwasher (#26) and

one locknut (#33). See Figure 3.

2.

Slide Actuator Sleeve (#15) over Actuator (#16) and place

Actuator Cap (#13) on top. Slide Pivot Tube (#14) in hole

near the top of Actuator until equal amounts stick out on

both sides of Actuator. See Figure 4.

NOTE: If necessary, use a hammer or rubber mallet

to tap in Spacer.

ASSEMBLY INSTRUCTIONS (Day 5)

Figure 4

3.

Lay Pole (#2) on its side on two padded saw horses. Secure

Actuator  (#16)  to  Pole  (#2)  using  one  bolt  (#19),  split

lockwasher (#18), washer (#3) and two plastic washers (#5)

to thread into each side of Actuator. See Figure 4. Tighten

bolts tight.

4.

Insert Pole Cap (#1) into top of Pole (#2). It may be necessary

to use a hammer or rubber mallet to tap Cap in.

5.

Secure two stop spacers (#10) to pole, as shown in Figure

4, using one hex bolt (#7) and one hex nut (#4).

Figure 5

Figure 3

6.

Attach lower arms (#11) to Pole (#2), as shown in Figure

5, using a bolt (#7), two flatwashers (#3), six plastic washers

(#5), two spacers (#8) and hex nut (#4). Do NOT tighten

bolt (#7) at this time.

 

Note: make sure "Goalrilla lettering is right side up.

Содержание B2304W

Страница 1: ...re is tightened too soon mounting holes may not align and parts may not easily fit together Leave locknuts slightly loose until you are instructed to tighten them O W N E R S M A N U A L Please Do Not Return This Product to the Store Contact Escalade Sports customer service department at Phone 1 888 USA GOAL Toll Free Fax 1 866 873 3536 Toll Free E mail basketball escaladesports com Mailing Addres...

Страница 2: ...se paint completely and repaint with exterior enamel paint If rust has penetrated through the steel anywhere replace pole immediately Check system before each use for proper ballast loose hardware excessive wear and signs of corrosion and repair before using During play use extreme caution to keep players face away from the backboard rim and net Serious injury could occur if teeth face come in con...

Страница 3: ......

Страница 4: ...6 Push anchor system into concrete and agitate to work out voids in concrete Immediately use a level to level and square anchor plate to playing surface Clean off any concrete that may be on exposed threads Note The bottom four nuts will be forever embedded in concrete Let concrete stand for a MINIMUM of 72 hours 2 Assemble anchor system as follows Thread nut 35 to bottom of threads on anchor bolt...

Страница 5: ...tuator until equal amounts stick out on both sides of Actuator See Figure 4 NOTE If necessary use a hammer or rubber mallet to tap in Spacer ASSEMBLY INSTRUCTIONS Day 5 Figure 4 3 Lay Pole 2 on its side on two padded saw horses Secure Actuator 16 to Pole 2 using one bolt 19 split lockwasher 18 washer 3 and two plastic washers 5 to thread into each side of Actuator See Figure 4 Tighten bolts tight ...

Страница 6: ... FOR AT LEAST 3 DAYS 11 Locate hardware needed to mount pole to anchor bolts You will need eight flatwashers 37 four lock washers 36 four hex nuts 35 and four thread protectors 34 12 Put a flat washer 37 on each anchor bolt Lift post onto anchor system and secure with one flatwasher 37 one lock washer 36 and one hex nut 35 for each anchor bolt See Figure 8 Tighten all four hex nuts tight PLACING T...

Страница 7: ...and mount Goal Assembly 28 and Rim Pad 27 to Backboard as shown in Figure 11 using four bolts 29 eight washers 26 four lockwashers 25 and four nuts 24 Tighten fasteners finger tight leave them loose enough to level rim 18 Place a level across rim assembly and adjust rim until it is level Finish tightening the four nuts 19 Attach Rim Cover Plate 31 using four screws 32 See Figure 11 21 Adjust unit ...

Страница 8: ... Escalade Sports exclusive remedy Escalade Sports will not be liable for any other damages or expenses which may incur including but not limited to incidental or consequential damages Escalade Sports assumes no other obligations or liability on the part of the purchaser and Escalade Sports neither assumes nor authorizes any other person to assume for it any other liability in connection with the g...

Страница 9: ...7 2B 6098 01 5 8 SAE FLAT WSHR ZNC 8 38 2S 6494 01 Anchor Template 1 39 2B 6096 00 5 8 11 X 18 J Bolt 4 40 1S 6152 00 3 X 40 Rebar 4 41 7B 6255 00 Pull Pin 1 42 4A 6550 00 Actuator Handle 1 43 2L 6779 00 This Manual 1 44 2S 6487 01 Right Post Ear 1 45 2S 6488 01 Left Post Ear 1 46 7B 6291 00 Allen Wrench 1 Key Part Description Qty CARE INFORMATION BACKBOARD CARE AND MAINTENANCE Items needed to cle...

Страница 10: ...10 2L 6779 00 ...

Отзывы: