4 INSTALLATION
0463 431 101
- 10 -
© ESAB AB 2017
4
INSTALLATION
The installation must be carried out by a professional.
CAUTION!
This product is intended for industrial use. In a domestic environment this product
may cause radio interference. It is the user's responsibility to take adequate
precautions.
4.1
Location
Position the welding power source such way that its cooling air inlets and outlets are not
obstructed.
For Mig 4004i Pulse WeldCloud™, make sure the antenna on the top box is not covered or
blocked.
4.2
Lifting instruction
4.3
Mains supply
NOTE!
Mains supply requirements
This equipment complies with IEC 61000-3-12 provided that the short-circuit
power is greater than or equal to S
scmin
at the interface point between the user's
supply and the public system. It is the responsibility of the installer or user of the
equipment to ensure, by consultation with the distribution network operator if
necessary, that the equipment is connected only to a supply with a short-circuit
power greater than or equal to S
scmin
. Refer to the technical data in the
TECHNICAL DATA chapter.
Содержание Retrofit Aristo Mig 4004i WeldCloud
Страница 2: ......
Страница 3: ......
Страница 22: ...DIAGRAM 0463 431 101 22 ESAB AB 2017 DIAGRAM Mig 4004i Pulse and Mig 4004i Pulse WeldCloud ...
Страница 23: ...DIAGRAM 0463 431 101 23 ESAB AB 2017 Additional diagram for Mig 4004i Pulse WeldCloud ...