ESAB FABRICATOR 181i
INTRODUCTION 4-20 Manual 0-5449
4.16 Leak Testing the System
Leak test the system before putting into operation.
1. Be sure that there is a valve in the downstream equipment to turn off the gas flow.
2. With the cylinder valve open, adjust the regulator to deliver the maximum required delivery flow rate.
3. Close the cylinder valve. Watch to see if the high pressure or contents gauge drops, if it does you have a leak in the con-
nection between the regulator and the cylinder.
4. Once leak testing has been performed and there are no leaks in the system, slowly open the cylinder valve and proceed.
!
WARNING
If a leak has been detected anywhere in the system, dis continue use and have the system repaired.
DO NOT use leaking equipment. Do not attempt to repair a leaking system while the system is under
pressure..
Содержание Fabricator 181i
Страница 18: ...ESAB FABRICATOR 181i SAFETY AND INSTALLATION 3 8 Manual 0 5449 This Page Intentionally Blank...
Страница 40: ...ESAB FABRICATOR 181i THEORY OF OPERATION 5 2 Manual 0 5449 This Page Intentionally Blank...
Страница 64: ...ESAB FABRICATOR 181i DISASSEMBLY PROCEDURES 7 4 Manual 0 5449 A 09965_AB...
Страница 71: ...ESAB FABRICATOR 181i Manual 0 5449 8 3 ASSEMBLY PROCEDURES 8 7 A 10011 9 A 10114...
Страница 73: ...ESAB FABRICATOR 181i Manual 0 5449 8 5 ASSEMBLY PROCEDURES A 09965_AB...
Страница 76: ...ESAB FABRICATOR 181i ASSEMBLY PROCEDURES 8 8 Manual 0 5449 This Page Intentionally Blank...
Страница 79: ...ESAB FABRICATOR 181i Manual 0 5449 9 3 KEY SPARE PARTS Art A 10363 31 9 03 Power Source Art A 11243_AC...
Страница 82: ...REVISION HISTORY Date Rev Description 09 18 2015 AA Manual release...
Страница 83: ......