69
1) Open the indoor unit’s front panel and remove the electrical box cover.
4. Installation Walkthrough
4.5. Wiring
4.5.5. Wiring Process
2) Acquire one (or two) power cable(s) of suitable length that is compliant to all local safety regulations.
For AW6/09/11/13-V6-MBG Units:
A. Insert one end of this cable through
the cable gland on the bottom of
the indoor unit, and connect it with
the heat pump power supply
terminals (PE, N, L).
B. Fasten the cable gland to ensure
the cable won’t loosen.
C. Connect the other end of the cable
to the city power supply.
A
B
C
PE
N
L
Содержание AW11-V6-MBG
Страница 2: ...2 ...
Страница 12: ...Outdoor unit 2 Overview of the Units 12 2 1 Functional Diagrams AW6 V6 MBG AW9 V6 MBG ...
Страница 13: ...Outdoor unit 2 Overview of the Units 13 2 1 Functional Diagrams AW11 V6 MBG AW13 V6 MBG ...
Страница 81: ......