JA06062019
U
-00147
9
Wall Installation
Step 13:
Measure the overall length and height of the frame and drill holes for the top brackets. Line up the
wall brackets with the drilled holes on the installation location and screw them in using a Phillips screwdriver.
If not installing into a structural wood stud, use a hollow wall anchor then screw in the M5x50 wood screws
with a screwdriver. Make sure the brackets are leveled.
Step 14
: Position the fixed frame screen onto the top wall brackets as shown below and push down at the
center of the top of the frame to secure.
For Technical Support or an Elite Screens contact in your area, visit
www.elitescreens.com
Item
X = Wall
bracket distance
X1 = Bracket
hole distance
Y = Top/Bottom
Wall Bracket Height
AR103H
1200mm(47.24”) 35mm(1.37”)
1110mm(43.7”)
Don’t lock the screw to the bottom.
l.
k.