Step 8:
Hook one end of the spring and secure inside the groove of the frame, use the
spring hook (h)
to
attach the spring to the hole located on the screen material’s outer edge in the following order.
Begin by first attaching the center points on both vertical (left/right) sides,
steps 1-2
. Then the center points
on both horizontal (top/bottom) sides,
steps 3-4
. Once all center points have been secured, make sure the
screen material is still within the marked areas before proceeding to attach the next springs.
Continue attaching the rest of the springs to the material in the following order in
steps 5-12
.
Note (after all springs have been attached):
Correct material installation
–Corners of the screen material are properly wrapped around the corner edges
of the frame and material is evenly tensioned and flat, creating a nicely taut surface.
Incorrect material installation
–The corners of the screen material are not properly wrapped along the edge
of the frame leaving the material with unbalanced tension and an uneven finish. To correct, detach springs
from material at the corner(s) where material does not lie flat along the edge of the frame, reposition the
material so that it lies flat and wraps along the edge of the frame, and reattach springs to the material.
Note:
Please make note of the yellow label and spring in the center of the frame. This is an indicator to start
the screen material installation process from the middle area of the frame.
h.
i.
5
6
7
8
9
11
10
12
1
2
3
4
To avoid ripples forming in the material it is imperative that all of the corners are properly wrapped around
the edges as illustrated in the check mark diagrams.