background image

Mains connection

In order to fulfil the safety standard (IEC 60950), the mains cable must be routed via the
provided cable clip inside the BDR-510/2 box.

Mains terminal block

Cable clip

Mains cable

Mains cable

Mains cable clip

Connect the mains lead to the terminal block X2.

Make sure that the Mains Selection switch (S1) is set to match the local mains supply
(115VAC or 230VAC).

X1

X3

MAINS IN

X2

N L

MAINS

SELECT

F5

CC NC NO
Power Fail

Detect

ERNA

IN

-     +

- +

1

Ih 140

265VAC

DANGER

ACHTUNG

230

11

5

S1

XA1

XB1

- +

ERNA OUT

- +

- +

2

3

4

- +

5

- +

6

- +

7

- +

8

XG1

XC1

XD1

XE1

XF1

XH1

Mains - Live

Mains - Neutral  (Blue)
Mains - Earth  (Yellow/Green)

Mains selection switch

Mains connection

Make sure that each terminal is connected to the corresponding terminal of the mains outlet
(i.e. Phase to Phase, Neutral to Neutral and Earth to Earth). Otherwise malfunction or even
damage to the BED-108/2 will occur.
For specification of mains, refer to 

Specifications,

 at the end of these instructions.

RS485 (ERNA Camera control) input connection

The RS485 signal is connected to terminal X1.
It is important that the polarity of the connection is correct, otherwise it will not be possible
to obtain control.
Note, the RS485 input is galvanic separated from the rest of the circuit in order to avoid
ground loop problems, therefore:

DO NOT CONNECT THE SCREEN OF THE CABLE TO GROUND/EARTH!

.

RS485 (ERNA Camera control) output connection

The RS485 output signal is connected to the terminals XA1 to XH1.

Power failure connection

If an alarm in connection with mains failure is necessary, the connection can be made to
terminal X3. Potential free contacts are provided for a normally open or normally closed
output.

Installation Instructions BED-108/2

3020-00041

Page 5

Содержание BED-108/2

Страница 1: ...Installation Instructions BED 108 2 Simplex RS485 Distribution Amplifier 3020 00041...

Страница 2: ...box should be mounted on a plane surface to avoid twisting of the box resulting in possible leakage PWR X1 X3 MAINS IN X2 N L MAINS SELECT F5 CC NC NO Power Fail Detect ERNA IN 1 Ih 140 265VAC DANGER...

Страница 3: ...ed in order to avoid malfunction or damage to the BED 108 2 or the connected equipment All cables to and from the BED 108 2 are fed through the cable glands Choose an appropriate size gland for the ac...

Страница 4: ...ty standard IEC 60950 BED 108 2 Layout The BED 108 2 has been designed for easy installation and set up The below figure shows the layout of the Simplex RS485 Distribution Unit PWR X1 X3 MAINS IN X2 N...

Страница 5: ...Phase Neutral to Neutral and Earth to Earth Otherwise malfunction or even damage to the BED 108 2 will occur For specification of mains refer to Specifications at the end of these instructions RS485 E...

Страница 6: ...C 253 230 207 Mains input 230VAC 115 230VAC selectable VAC 126 115 104 Mains input 115VAC General using 0 6 mm solid copper twisted pair standard telephone cable 25 C km 5 Transmission distance Potent...

Страница 7: ...X 01903 77 27 07 E MAIL sally ernitec uk co uk GERMAN OFFICE ERNITEC GmbH STORMARNRING 28 22145 STAPELFELD GERMANY TELEPHONE 040 6756 25 0 TELEFAX 040 67 56 25 25 E MAIL ernitec aol com FRENCH OFFICE...

Отзывы: