# VH700080305
- 11 -
6. OPERATION PRINCIPLES
Before beginning work the oil tank plug [9] should be loosened by approx.
one turn in order to equalize the pressure in the oil tank during work.
After finishing work, the plug should be tightened for transportation.
Remove possible load on the system by pressing the lever of the drain valve
[4].
Connect external equipment to the pressure tube using the quick couplings.
In order to start the oil pumping, multiply press and release the foot [26].
In order to drain oil from the external equipment, the lever of the drain valve
[4] should be pressed into the pump and held until the load release of entire
system.
21
1
Plug
H700-01-22-A
22
1
Valve housing
H700-01-23
23
1
Spring
H700-01-24-A
24
1
Spring
H700-01-25
25
2
Spring
H700-01-26-A
26
1
Pedal unit
H700-02-00-A
27
1
Base
H700-03-00-A
28
1
Filter
HFIL_H-700-FSO
29
2
Plug
HOKO_S-VSTI-M10-1-ED
30
1
Washer
HOPO_KDS12A3C
31
1
Cord
HPWC_090-020-70
32
1
Ring
HPZG_WSA-000250-N9MMN
33
1
Valve holdfast
HR300-17-A
34
1
O-ring
HUOR_OR3,3-2,4
35
2
O-ring
HUOR_OR57-3
36
1
O-ring
HUOR_OR8,3-2,4
37
1
Ball
HUTR_DB0000635-N7696
38
1
Sealing ring
HUTR_RR1300250-Z52N
39
1
Sealing ring
HUTR_RS1500100-T46N
40
1
Rubber casing
NANP_TYP-126-P
41
4
Ring
NEZO_PZ-8
42
3
Washer
NEZP_P1A-6.4-OC
43
1
Screw
NEZS_WI-M6-10-8.8OC
44
3
Screw
NEZS_WI-M6-20-8.8OC
45
2
Screw
NEZS_WP-M4-6-OC
46
2
Ball
NLKU_4,75
47
2
Ball
NLKU_6,35
48
2
Ball
NLKU_8
49
1
Fast connection PM
PM-00
50
1
Fast connection cover
PM_OSLONA
51
1
Spring
WH100-01-22-A