
2
Installing the Equipment
Chapter
2
Contents
Installing the Equipment ....................................................................... 2-3
Requirements ................................................................................ 2-3
Supplies..................................................................................... 2-3
Checks............................................................................... 2-3
Inspection .......................................................................... 2-3
Moving the Equipment Safely............................................................... 2-4
Installing the Equipment ....................................................................... 2-4
Fixing and Rack Mounting .................................................................... 2-4
2.3.2 Ventilation............................................................................................. 2-4
2.3.2.1
Openings in the Chassis....................................................................... 2-5
Protection from Moisture ...................................................................... 2-6
Installing Cables - Safety...................................................................... 2-6
Statements .............................................................. 2-6
55022/CISPR22.............................................................................. 2-6
Operation............................................................................ 2-7
AC Power Supply Cord......................................................................... 2-8
Connecting the Equipment to the AC Power Supply ............................ 2-8
Protective Earth/Technical Earth .......................................................... 2-8
Rear Panel Signal Connectors ............................................................. 2-8
SVP 2000 Encoder HD/SD SDI Interface............................................. 2-8
SVP 2000 Decoder SDI Interface......................................................... 2-9
SVP 2000 GigE IP Interface ................................................................. 2-9
SVP 2000 USB Interface .................................................................... 2-10
Archiving Option (SVP2000/SWO/EN/FI-ST) ..................................... 2-10
Upgrade.............................................................................. 2-10
EN/LZT 790 0046/1 R1A
2-1
Содержание SVP 2000
Страница 1: ...SVP 2000 Video Processor Software Version 3 0 and later REFERENCE GUIDE EN LZT 790 0046 1 R1A...
Страница 24: ...Introduction EN LZT 790 0046 1 R1A 1 16 BLANK...
Страница 36: ...Getting Started BLANK EN LZT 790 0046 1 R1A 3 2...
Страница 50: ...Encoder Web based GUI Control BLANK EN LZT 790 0046 1 R1A 4 4...
Страница 61: ...Encoder Web based GUI Control Figure 4 8 TS Input Tabbed Page EN LZT 790 0046 1 R1A 4 15...
Страница 98: ...Decoder Web based GUI Control BLANK EN LZT 790 0046 1 R1A 5 4...
Страница 140: ...Software Licensing and Upgrades BLANK EN LZT 790 0046 1 R1A 6 2...
Страница 146: ...Fault Finding and Troubleshooting BLANK EN LZT 790 0046 1 R1A 7 2...
Страница 175: ...Glossary YUV Y Luminance component Brightness U and V Chrominance Color difference EN LZT 790 0046 1 R1A A 21...
Страница 176: ...Glossary EN LZT 790 0046 1 R1A A 22 BLANK...
Страница 190: ...Events Descriptions BLANK EN LZT 790 0046 1 R1A C 2...