
RBS 2308 and RBS 2309 User’s Guide
8.2
Work Process for PSTU Startup
150
8.3
Procedure
151
9
RBS Site Integration
161
9.1
Testing Transmission
162
9.2
Bringing the RBS into Service
164
9.3
Making Test Calls on the Air Interface
165
9.4
Performing Concluding Routines
169
10
Maintenance
175
10.1
Introduction
175
10.2
Preconditions
175
10.3
Fault Localization Using OMT
176
10.4
Troubleshooting Using the RBS Indicators
193
10.5
HW Replacement
207
10.6
Returning Hardware
255
11
Reconfiguring the RBS for IP Transmission
261
11.1
Introduction
261
11.2
Preconditions
261
11.3
Reconfiguration Procedure
261
12
Glossary
271
EN/LZT 720 0027 Uen R8A 2006-06-27
Содержание RBS 2308
Страница 1: ...Ericsson GSM System RBS 2308 and RBS 2309 User s Guide EN LZT 720 0027 R8A...
Страница 2: ......
Страница 3: ...RBS 2308 and RBS 2309 User s Guide...
Страница 8: ...RBS 2308 and RBS 2309 User s Guide EN LZT 720 0027 Uen R8A 2006 06 27...
Страница 34: ...RBS 2308 and RBS 2309 User s Guide 26 EN LZT 720 0027 Uen R8A 2006 06 27...
Страница 42: ...RBS 2308 and RBS 2309 User s Guide 34 EN LZT 720 0027 Uen R8A 2006 06 27...
Страница 52: ...RBS 2308 and RBS 2309 User s Guide Figure 17 The RBS Installation Process 44 EN LZT 720 0027 Uen R8A 2006 06 27...