
RBS 2308 and RBS 2309 User’s Guide
5
Installation of RBS
5.1
Introduction
This document describes how to install the RBS 2308 and RBS 2309.
Target Group
The target group for this instruction is personnel involved in the installation of
an RBS.
5.2
Preconditions
This section provides preconditions that must be met before starting the
installation work.
Note:
Specific preconditions exist for wall and pole mounting.
Documentation
This section presents additional documents required for the installation
procedure.
Ensure that the following documents are available:
•
Completed and approved record prepared during site preparation
•
Site Installation Documentation (prepared by the Installation Engineering
department)
Standard Site Material Installation
Instructions
EN/LZT 720 0014
General Preconditions
Before starting site work, ensure the following:
•
Site access permission received
•
Ordered RBS, equipment, specified tools and other necessary facilities
have been delivered
•
Site power is available
•
Site Grounding Point is available
41
EN/LZT 720 0027 Uen R8A 2006-06-27
Содержание RBS 2308
Страница 1: ...Ericsson GSM System RBS 2308 and RBS 2309 User s Guide EN LZT 720 0027 R8A...
Страница 2: ......
Страница 3: ...RBS 2308 and RBS 2309 User s Guide...
Страница 8: ...RBS 2308 and RBS 2309 User s Guide EN LZT 720 0027 Uen R8A 2006 06 27...
Страница 34: ...RBS 2308 and RBS 2309 User s Guide 26 EN LZT 720 0027 Uen R8A 2006 06 27...
Страница 42: ...RBS 2308 and RBS 2309 User s Guide 34 EN LZT 720 0027 Uen R8A 2006 06 27...
Страница 52: ...RBS 2308 and RBS 2309 User s Guide Figure 17 The RBS Installation Process 44 EN LZT 720 0027 Uen R8A 2006 06 27...