
Installation
16
3/1531-HSD 101 41 Uen E 2007-08-13
6.2.4
Cabling the Power Connections (No.2 and No.4)
The EDN612 IP DSLAM and ESN212 switch are connected to the EPN210
Power Distribution using TSR 263 70/600 cable (EDA Power cable
standard).
The cable connectors are fastened to the nodes by using a Torque-driver
with TORX T08 bit (0.3 Nm recommended). Figure 9 on page 12 (No. 2)
shows power connections.
The EPN210 Power Distribution Node is connected to an external power
distribution using TSR 263 69/3000 (EDA D-Sub Power cable open ended)
see details about the power requirements and distribution in section 4 on
page 7. Figure 9 on page 12 (No. 4) shows the external power distribution
connectors.
6.2.5
Cabling the Subscriber Line (No.3)
The EDN612 IP DSLAM is connected to the splitter using EDA Subscriber
cable. The subscriber cable is produced in different lengths. The following
cables are available:
Table 6
Ericsson no.
Description
TSR 432 126/3000
EDA Subscriber cable open ended
3m
TSR 432 126/10M
EDA Subscriber cable open ended
10m
TSR 432 138/500
EDA Subscriber cable Edge
connector 500mm
TSR 432 138/800
EDA Subscriber cable Edge
connector 800mm
To connect the subscriber lines cable align the cable connector with the
connector on the EDN612, and insert the connector gently.
!