![Ericsson CALL CENTRE SUPERVISOR Скачать руководство пользователя страница 48](http://html1.mh-extra.com/html/ericsson/call-centre-supervisor/call-centre-supervisor_installation-manual_2423548048.webp)
$GGLQJD1HZ'LVSOD\8QLW
BusinessPhone Call Centre Supervisor - Standard
Installation Guide
EN/LZT BS 102 063/S R2B
48
7HVWLQJ&RQQHFWLRQV
The
Test
button allows you to test the connection between the CCS and a Display
Unit.
To carry out a test:
Select the Display Unit to test in the grid
Click the Test button
An information window on the PC will inform you that a message will be dis-
played on the selected Display Unit momentarily.
The system takes the first configured message and attempts to display it imme-
diately on the selected Display Unit. If there are no messages configured then the
test cannot be made.
'HOHWLQJD&RQQHFWLRQ
To delete a connection simply select the Display Unit name in the name list and
click the
Delete
button.