background image

3

.

  

Connect equipment side wiring to the UTB screw terminals marked EQUIP  (1', 2', 3', 4'). The 
"EQUIP" side of the UTB is the protected side and wires to the equipment being protected.

2

.

  

Connect line side wiring to the UTB screw terminals marked LINE (1, 2, 3, 4). The "LINE" side of 

the UTB is the "exposed side" where the surge is expected to originate.

5

.

  

Connect the UTB's ground screw terminal to a low impedance ground using as direct a path as 

possible. This "ground" should also be referenced to the equipment being protected. When the 
UTB is installed on a DIN rail, grounding of the unit can be achieved by connecting the rail to 
ground.  

1

.

   

Ensure that that all warnings safety instructions provided in this document are observed and 

that power is removed from the area and the circuits to be connected.

4

.

   

The UTB should be installed as close to the equipment being protected as possible. Where 

protecting long cable runs (

>

 30 meters), a UTB unit should be installed at either end of the 

cable.

M

AINTENANCE:

ELECTRICAL CONNECTION:

F

ailure of a UTB is usually indicated by interruption of data or a fault on the signal (control) line. The 

UTB has been designed for simple plug-in modular replacement, without the need to disturb circuit 
wiring. Before removing a UTB module from service, ensure that the power has been removed and 
if possible "locked out". Qualified personnel should only undertake replacement of UTB modules. 
Replacement plug-in modules are available.

N

OTE:

 It is very important to ensure that the new module is of the same type and voltage as that 

being replaced.

P

lease follow the sequence indicated:

SPECIAL NOTE:

T

he CRITEC UTB you have installed provides protection to your equipment from the damaging 

effects  of  surges  on  communications  and  low  voltage  secondary  power  cables.  Damage  to 
equipment  can  also  occur  due  to  surges  entering  your  equipment  via  mains  voltage  power 
cabling. ERICO recommend the installation of mains power CRITEC surge protective devices 
(SPDs) to further reduce the risk of damage.

4

. Improper installation, misuse, misapplication or other failure to completely  follow ERICO's 

instructions and warnings may cause product malfunction, property damage, serious bodily 
injury and death.

E

lectrical  shock  or  burn  hazard.    Installation  of  this  UTB  should  only  be  made  by  qualified 

personnel.  Failure to lockout electrical power during installation or maintenance can result in fatal 
electrocution, severe burns, or other injuries.  Before working with or making any connections to 
this electrical panel, be sure that power has been removed from all associated wiring, electrical 
panels, and other electrical equipment.

S

AFETY INSTRUCTIONS:

 All governing codes and regulations and those required by the job site 

must be observed. Always use appropriate safety equipment such as eye protection, hard hat, 
and gloves as appropriate to the application.

1

. ERICO products shall be installed and used only as indicated in ERICO product instruction 

sheets and training materials.  Instruction sheets are available at www.erico.com and from your 
ERICO customer service representative.

W

ARNING:

H

AZARDOUS  VOLTAGES  EXIST  INTERNAL  TO  THE  UTB.    THIS  UNIT  SHOULD  BE 

INSTALLED AND SERVICED ONLY BY QUALIFIED PERSONNEL IN CONFORMANCE WITH 
ALL GOVERNING CODES, AND INSTRUCTIONS.

D

ANGER:

2

. ERICO products must never be used for a purpose other than the purpose for which they were 

designed or in a manner that exceeds specified load ratings.

3

.  All  instructions  must  be  completely  followed  to  ensure  proper  and  safe  installation  and 

performance.

C

opyright 2008 ERICO International Corporation. All rights reserved.

C

ADDY, CADWELD, CRITEC, ERICO, ERIFLEX, ERITECH and LENTON are registered 

trademarks of ERICO International Corporation.

UNIVERSAL TRANSIENT BARRIER

Note: It is most important that the UTB is installed by suitably qualified personnel. If the 
UTB is installed without a suitable earth, or the “Line Side” and “Equipment Side” are 
reversed, damage may result to the UTB under surge conditions

Installation Guide

Отзывы: