
Cleaning and maintenance
70/84
–
Screw the lid with the hose onto the new canister.
–
Push the hose well down so that it touches the bottom of the canister.
–
Put the canister back in the device.
–
Close the bed base. You should hear the bed base click into place.
Venting
NOTE:
To ventilate, access to the Professional Setup Manager on
the control panel is required.
–
Go to the Professional Setup Manager.
–
Activate the fill mode in the AQUA FRESH AROMA menu.
–
Close the canopy.
The system will now be ventilated for 60 seconds. The AQUA SYSTEM liquid
will be released from the nozzles during this period.
–
Then test the AQUA SYSTEM in test mode. In test mode, the nozzles
spray for 3 seconds. Repeat the ventilation process if it does not work.
Содержание AFFINITY 700 ADVANCED PERFORMANCE
Страница 1: ...AFFINITY Series 700 900 990 GEBRAUCHSANWEISUNG OPERATING INSTRUCTIONS...
Страница 2: ......
Страница 44: ...Bedienung 42 94 AFFINITY 900 ADVANCED PERFORMANCE AC PLUS AFFINITY 990 DYNAMIC PERFORMANCE AC PLUS...
Страница 96: ...Index 94 94...
Страница 130: ...Operation 34 84 AFFINITY 900 ADVANCED PERFORMANCE AC PLUS AFFINITY 990 DYNAMIC PERFORMANCE AC PLUS...
Страница 180: ...Index 84 84 U UV exposure 9 UV lamps Control 74 Power levels 74 Rated power 74 V Ventilation 15 W Warranty 27...
Страница 181: ......