background image

Fittings and parts checklist 

A

C

C

D

E

A

Headboard*1

B

Footboard*1

C

D

E

F

G

threads*8

N

M

L

washers*2

K

J

spanner*1

I

dowels*8

H

side rails*2

centre rail*1

slats double bed*32
slats king size bed*34
ends for slats double*64
ends for slats king size*68

threads*8

12mm screws*12

washers*2

central brackets*2

spanner*1

dowels*8

half moon washer*8

nuts and bolts*2 each

Содержание Salina 3886

Страница 1: ...attempting to assemble this product A full checklist of components is given in this leaflet If any components are missing please contact the retailer from whom you purchased this product This product is HEAVY it should be assembled as near as possible to the point of use TAKE CARE WHEN LIFTING to avoid personal injury and or damage to the product This product takes approximately 40 MINUTES to asse...

Страница 2: ...ds 8 N M L washers 2 K J spanner 1 I dowels 8 H side rails 2 centre rail 1 slats double bed 32 slats king size bed 34 ends for slats double 64 ends for slats king size 68 threads 8 12mm screws 12 washers 2 central brackets 2 spanner 1 dowels 8 half moon washer 8 nuts and bolts 2 each ...

Страница 3: ...de rails C are facing upwards AND you have the Left and Right rails see page 2 on the correct sides locate these side rails onto the protruding threads on the headboard and foot board As you do this slide a half moon washer onto the thread when it comes through into the circular hole in the side of the rail then screw on one of the 8 nuts FINGER TIGHT ONLY Repeat with the other 3 corners Fittings ...

Страница 4: ... and the 2 washers and nuts 5 Push a plastic cap onto each end of a slat and with the peg facing downwards push the slat into the pre drilled holes as shown below Repeat for all the slats Once the centre rail is in place tighten all four corners so that they are secured PLEASE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE Ercol Furniture Ltd Summerleys Road Princes Risborough Buckinghamshire HP27 9...

Отзывы: