
LUBRICATION AND MAINTENANCE
5-3
Before Initial Use
The following services must be performed before initial use of the Apache Sprayer and repeated at the
the interval prescribed in the Apache Sprayer Service Interval Chart.
•
Grease Boom. See “Grease Boom” on page 5-6.
•
Torque Lug Nuts. See “Torque Lug Nuts” on page 5-12.
•
Grease Steering Components. See “Grease Steering Components” on page 5-12.
•
Grease Axle Components. See “Grease Axle Components” on page 5-13.
•
Grease Driveline. See “Grease Driveline Components” on page 5-15.
•
Check Axle Extension Bolt Torque. See “Check Axle Extension Bolt Torque” on page 5-16.
•
Adjust Poly Tank Straps. See “Adjust Poly Tank Straps (if equipped)” on page 5-17.
•
Adjust Boom. See “Adjust Boom” on page 5-3.
After First 10 Hours
The following services must be performed after the first 10 hours of operation and repeated at the inter-
val prescribed in the Apache Sprayer Service Interval Chart.
•
Torque Lug Nuts. See “Torque Lug Nuts” on page 5-12.
•
Adjust Poly Tank Straps. See “Adjust Poly Tank Straps (if equipped)” on page 5-17.
Adjust Boom
NOTE: All boom adjustments should be per-
formed with the boom fully unfolded and low-
ered.
Boom Lead
The outermost tip of the booms should lead
the boom rack by three to four inches.
To adjust the boom lead, loosen the boom
lead bolts (1) near the bottom of the boom
rack. Turn the jam nuts (2) toward the end of
the boom to increase boom lead and turn the
jam nuts (2) toward the center of the boom
rack to reduce boom lead.
Tighten the jam nuts and lead bolts after cor-
rect lead is set. Torque the boom lead bolts to
297 ft-lb [402.6 N•m].
Repeat the steps for the remaining boom, as
required.
Содержание APACHE AS1010
Страница 2: ......
Страница 4: ......
Страница 14: ...SAFETY DECALS 2 2 Cab Mounted Decals ...
Страница 15: ...SAFETY DECALS 2 3 Engine Mounted Decals Chassis Mounted Decals ...
Страница 16: ...SAFETY DECALS 2 4 Tank Mounted Decals ...
Страница 36: ...VEHICLE OPERATION 3 20 ...
Страница 44: ...WET SYSTEM OPERATION 4 8 ...
Страница 45: ...WET SYSTEM OPERATION 4 9 ...
Страница 46: ...WET SYSTEM OPERATION 4 10 ...
Страница 66: ...WET SYSTEM OPERATION 4 30 ...
Страница 100: ...LUBRICATION AND MAINTENANCE 5 34 ...
Страница 114: ...TROUBLESHOOTING 8 4 ...
Страница 115: ...9 1 SYSTEM SCHEMATICS Hydraulic System ...
Страница 116: ...9 2 Electrical System Sheet 1 of 5 See Sheet 2 of 5 See Sheet 5 of 5 See Sheet 5 of 5 ...
Страница 117: ...9 3 Electrical System Sheet 2 of 5 See Sheet 5 of 5 See Sheet 3 of 5 See Sheet 1 of 5 See Sheet 4 of 5 ...
Страница 118: ...9 4 Electrical System Sheet 3 of 5 See Sheet 2 of 5 ...
Страница 119: ...9 5 Electrical System Sheet 4 of 5 See Sheet 2 of 5 ...
Страница 120: ...9 6 Electrical System Sheet 5 of 5 See Sheet 1 of 5 See Sheet 1 of 5 See Sheet 2 of 5 ...