JA02132020
U
-00153
3
Frame Assembly
Step 1
: Place the included soft padded EPE sponge sheet on a clean area where the screen will be assembled.
Step 2:
Position the pieces of the frame on the EPE sponge in the arrangement shown below.
Step 3:
Insert
center joint (a/b)
connectors into
one-half of the horizontal frame (B/C)
and secure with the
M4x7
screws (M)
as shown in the illustration below.
Step 4:
Connect the
elbow joints (c/d)
to the top and bottom sections of the vertical frame. Once inserted, connect
the vertical sections to the horizontal frame sections. Make sure all holes are in alignment and the frame pieces are
flush (no gaps). They should form perfect right angles.
Item
Parts List
100
”
110
”
120
”
135
”
150
”
165
”
180
”
200
”
a.
Center Joints- M4 (bottom position)
6
6
6
6
6
6
6
6
b.
Center Joints-D5 (top position)
4
4
4
4
4
4
4
4
c.
Elbow Joints M4 (bottom position)
8
8
8
8
8
8
8
8
d.
Elbow Joints D5 (top position)
4
4
4
4
4
4
4
4
e.
Top
wall brackets
2
2
2
2
2
3
3
3
f.
Bottom wall brackets
2
2
2
2
2
3
3
3
g.
M4x7 Screws
32
32
32
32
32
32
32
32
h.
Spring
92
100
110
122
136
150
160
178
i.
Spring Hook
2
2
2
2
2
2
2
2
k.
Φ5x50 Wall Screws
6
6
6
6
6
9
9
9
l.
Hollow Wall anchors
6
6
6
6
6
9
9
9
m.
M4x4 Screws
24
24
24
24
24
24
24
24
n.
Angle cover
4
4
4
4
4
4
4
4
o.
Center Support Bar
1
1
1
1
1
2
2
2
p.
White gloves
2
2
2
2
2
2
2
2
r.
Bottom plastic eyelet
86
94
104
116
130
144
154
172
s.
Top plastic eyelet
86
94
104
116
130
144
154
172
b.
a.
c.
d.
g.
…
b.
a.
d.
c
.
Tip: The center joint (b) with the larger diameter holes should be on top.
Tip: The elbow joint (d) with the larger diameter holes should be on top.