3.2.4 C160 PSB/PSE Board Removal
1.
Remove the upper case (see Section 3.2.1).
2.
Remove 1 CBB (M3
×
10) screw securing the power supply board to the lower case, 1 CPS (M3
×
6)
screw securing the board frame to the grounding plate, 1 CBB (M3x10) screw fixing the board frame
and 1 big screw securing the board frame to the lower case via the grounding plate.
CPS(M3x6)
CBB(M3x10)
Big Screw
CBB(M3x10)
C160 PSB/PSE Board
Grounding Plate
Figure 3-6. C160 PSB/PSE Board Removal
EPSON Stylus Color 200 / EPSON Stylus 200
Disassembly and Assembly
Rev. A
3-5
Содержание CBB
Страница 1: ...EPSON TERMINAL PRINTER EPSON Stylus Color 200 EPSON Stylus 200 SERVICE MANUAL EPSON Rev A 4006645 ...
Страница 5: ...REVISION SHEET Revision Issue Date Contents Rev A July 15 1996 1st issue v ...
Страница 71: ...Figure 6 1 Lubrication and Adhesive Point Maintenance Epson Stylus Color 200 Epson Stylus 200 6 4 Rev A ...
Страница 78: ...Figure A 3 C160 PSE Board Circuit Diagram Appendix Epson Stylus Color 200 Epson Stylus 200 A 6 Rev A ...
Страница 84: ...EPSON ...