![EPSOM E7105T Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/epsom/e7105t/e7105t_assembly-manual_2418534006.webp)
EPSOM – E7105T 6
For assembly advice or parts go to
STEP 4
Your pack will contain three boards the same size.
1 x Bottom Rail
1 x Rear Toeboard
1 x Front Toeboard
Install two
H2 Cams
into each piece as indicated
H2 Cam
Push the
H15 Dowels
into each end of the boards as indicated.
H15 Dowel
ASSEMBLE THE CHEST
STEP 1
Attach the Rail and Toeboards to the LH End.
Position the Rails and Toeboards over the Connecting Bolts installed in the End – take note of the
drawing below. Ensure the laminate side of the Front Toeboard face outwards.
The Bottom Rail and the
Rear
Toeboard
are
interchangeable – Make sure
the Cams face towards the
top of the End.
Lock Rail and Toeboards in
place by tightening all three
Metal Cams in a clockwise
direction at least a ¼ of a
turn.
Bottom Rail / Rear Toeboard – no finish
Front Toeboard – black laminate on one side